*** SYSTEM INITIALIZING *** BOOTING MAIN OS... [E-OS v2.12.5] MAIN OS CHECK... [GOOD] THE DATE IS: JAN 1, 1970 THE TIME IS: 00:00 RUN> AUTOCHK *** AUTOCHECK STARTING *** [...] [...] [...] [...] [...] *** AUTOCHECK COMPLETE *** --- RESULTS --- POWER: REACTOR FUNCTIONAL CRYOBAY: 11 NON-FUNCTIONAL, 1 FUNCTIONAL MAIN ENGINES: OPERATING AT 66.5% CAPACITY NAVIGATION: NON-FUNCTIONAL THERMAL CONTROLS: OPERATING AT 70% CAPACITY COMPUTER SYSTEMS: FAULT IN SECTION A3, OTHERWISE FUNCTIONAL LIFE SUPPORT: OPERATING AT 96% CAPACITY HULL: NO BREACHES, INTEGRITY AT 98% COMMUNICATIONS: FULLY FUNCTIONAL, RELAY DETECTED *** ATTEMPTING CONNECTION TO QEC RELAY *** [...] [...] [...] *** CONNECTION SUCCESSFUL *** *** BEGIN WAKE-UP FOR G. SIMMONS ***