[HN Gopher] Doing too much work on one's own before looping in o...
       ___________________________________________________________________
        
       Doing too much work on one's own before looping in others
        
       Author : alokedesai
       Score  : 326 points
       Date   : 2022-01-25 17:39 UTC (5 hours ago)
        
 (HTM) web link (thezbook.com)
 (TXT) w3m dump (thezbook.com)
        
       | zachlloyd wrote:
       | working on the issue with the site going down. more traffic than
       | i expected...
        
         | mt_ wrote:
         | Would you consider that a mistake most engineers make?
        
       | elric wrote:
       | Knowing when to loop in others is one of the skills that makes a
       | senior engineer. Too early and you end up wasting other people's
       | time. Too late and you end up wasting everyone's time. Finding
       | the sweet spot is important, but it's also important to learn
       | which questions to ask. It's one of those skills that I wish
       | could be taught, but it seems something you have to get a feel
       | for over time.
        
       | alokedesai wrote:
       | I work at Warp (https://www.warp.dev/) where Zach, the author of
       | the post, is the founder.
       | 
       | One practice we've gotten into the habit of is demoing projects
       | at standup as soon as possible. I've found this has been useful
       | to force myself to get to an end-to-end version of a project
       | sooner. This is useful not just in derisking the technical
       | implementation but also in getting product feedback sooner. By
       | playing around a live demo earlier, we often find that the
       | product experience needs to be refined in ways we couldn't
       | validate from Figma mocks alone.
        
       | uejfiweun wrote:
       | I feel like one of the biggest antidotes to this is just a simple
       | daily standup. My team does this, a daily 30 minute meeting, and
       | everyone says what they're working on as well as any blockers.
       | Seems to work very well in terms of course correction at an early
       | point.
        
         | jack_riminton wrote:
         | I think because most people give very short descriptions in
         | their standups i.e. "Working on x today, with a bit of y, no
         | blockers". Perhaps due to things mentioned in the article,
         | people don't want to or feel the need to invite feedback
        
           | claylimo wrote:
           | Where I work everyone will do their check-in but the
           | important part is that everyone has a different personality.
           | Like some people can be more confused and have a hard time
           | explaining or even remembering what they did before so it's
           | helpful to ask questions during their check-in to see if they
           | need help. Some people might work on the same task for weeks.
           | People are often afraid to ask for help. Or, maybe their task
           | needs to be broken into something smaller given new
           | information. The daily check-in is also a way for them to
           | connect with someone else in the team who can actually help
           | them. I'll tell them to either hang out at the end of standup
           | or schedule a meeting with each other.
           | 
           | Having someone leading the standup, if done correctly, can
           | help hold people more accountable for what their progress is
           | toward the sprint goal and remove obstacles. This is one of
           | the responsibilities of a scrum master although you don't
           | need to be a scrum master at all to do this.
        
           | zachlloyd wrote:
           | Right, we do a standup, but if you're not careful the updates
           | can be generic enough like "making progress on X" where you
           | still end up working too long without feedback
        
       | ziggus wrote:
       | Why the conflation of 'engineer' and 'developer'? That's a bit
       | confusing.
        
         | spmurrayzzz wrote:
         | I'm curious, what about that semantic differentiation is
         | confusing for you?
         | 
         | At least in my experience, "Software Engineer" is a standard
         | title for the kind of work the author is describing in the
         | article and is often used interchangeably with "Developer".
        
           | io98763 wrote:
           | I think they mean generally. And I tend to agree. I had
           | suspicions while reading it but wasn't completely sure till I
           | checked the Author's bio on the right. Some, if not a lot, of
           | it doesn't apply well if at all the the "classic" fields of
           | engineering, where engineers tend to be much more focused and
           | trained in their skills.
        
             | gfody wrote:
             | there's no classical software development engineering so
             | depending where you were trained (web startup vs. software
             | company vs. deep in the bowls of a huge corporation etc.)
             | you could have very different ideas of normal - see eg:
             | https://www.stilldrinking.org/programming-sucks
        
             | spmurrayzzz wrote:
             | This seems, at best, an anecdotal and/or an arbitrary
             | distinction about what qualifies as "Engineering". Software
             | engineering, as an applied discipline both in name and in
             | practice, has existed since at least the mid-to-late
             | 1960's. And many of the orgs in those days which adopted
             | that title normatively, employed many folks who were
             | "focused and trained in their skills" (e.g. NASA) and
             | worked alongside of those in the more classical engineering
             | domains.
             | 
             | Speaking in my own experience, working closely with
             | hardware/mechanical/electrical folks on a novel product
             | line, they are exposed to a lot of the same subject matter
             | covered in the article. Many of the tradeoffs explored
             | there are absolutely relevant to the older engineering
             | disciplines.
        
         | jack_riminton wrote:
         | This is the least interesting thing in the article. It doesn't
         | matter.
        
         | recursive wrote:
         | I've never heard a difference between the two. Your confusion
         | is confusing.
        
       | sytse wrote:
       | GitLab our iteration value
       | https://about.gitlab.com/handbook/values/#iteration is meant to
       | address exactly this problem
        
       | kerneloftruth wrote:
       | "Looping in others" is an opportunity for others to say NO, or to
       | try and redirect you, or to jump (unwanted and unneeded) onto
       | your band wagon. If I'm working with true peers (not age or title
       | peers, but truly similar in talent and ability), then their early
       | involvement or collaboration is great.
       | 
       | Generally, however, I prefer to get solutions developed to the
       | point where they are their own proof. It's much harder to argue
       | against something that's (near or entirely) completed and which
       | proves to work. It's fine for me to then involve others to get
       | their feedback, etc.
        
         | TameAntelope wrote:
         | Proof to whom? Shouldn't you be developing things your
         | customers need, not some pet project you enjoy working on for
         | its own sake?
        
       | gorgoiler wrote:
       | Solid advice. Everything is such a difficult balancing act when
       | you work with other engineers. I say this because at the other
       | end of the spectrum its really easy to land yourself and those
       | around you in needless drama by asking too publicly for feedback
       | on ideas. _Hey everyone, just wondering what our thoughts as a
       | team are on auto formatting the codebase / switching tabs to
       | spaces / repainting the bike shed?_
       | 
       | Some wise advice I once got from an engineer who has gone on to
       | be a stellar engineering leader: utilise the power of managers.
       | Good managers are drama fire breaks. They can tell you -- without
       | raising the emotional stakes with anyone else -- why a particular
       | bit of tech debt exists, whether anyone on their team is going to
       | be amenable to you fiddling with it, and who to work with
       | directly on anything likely to cause drama would it have been
       | more widely shared.
       | 
       | Managers aren't immune to drama but the good ones can help keep
       | it minimised.
        
       | emptybottle wrote:
       | My experience is different in that large patch sets usually get a
       | "looks good" while smaller sets get a lot of varied feedback.
       | 
       | Depending on what your personal goals are (and your tolerance for
       | accountability should things go wrong) doing the work up front
       | can be a good approach.
        
         | redisman wrote:
         | I think that's just because it's too much work to review so
         | people give up
        
       | schrodera wrote:
       | Going dark alone does not very often yield results - even if the
       | right solution comes out getting others up to speed will remove
       | any time gained before easily.
       | 
       | Going dark as a team is a different story.
        
       | jackblemming wrote:
       | Why wasn't this caught by a million different processes that most
       | teams have? Scrum, team lead, n different managers, etc. This is
       | on the process, not the engineer.
        
         | denimnerd42 wrote:
         | we are probably hiding the work and not looping in those
         | mentioned precisely because it gets shut down
        
           | jackblemming wrote:
           | That's understandable. The nuance here is senior engineers
           | going off and doing things they know need to be done vs
           | juniors getting lost in the weeds. If you're the former, and
           | you're always shutdown from doing things you know are
           | important, you probably need to find new employment.
        
       | alanbernstein wrote:
       | > Internal Server Error
       | 
       | I do make that mistake quite often!
        
         | iab wrote:
         | Inadvertently insightful
        
       | louissan wrote:
       | error 500 xD
        
       | mberning wrote:
       | Spending a few weeks on exploratory or speculative work is not
       | really a huge time commitment. If it was going to drag on for
       | months I would question it.
       | 
       | I also challenge the "deliver in small PRs" idea. Yes in practice
       | that would be ideal. But often when you are doing something
       | completely off the map there is no point to submitting the PRs
       | for the 5 things that didn't work. The author is falling into the
       | same trap that scrum advocates and agilists fall into. Anything
       | can be broken down into teeny tiny bit size deliverables and
       | managed that way. Again, it would be ideal if that were the case,
       | but sometimes you just need to give your best engineers some time
       | and space to swing for the fences.
        
       | heisenbit wrote:
       | While this may be true there is real long term benefit gained by
       | me trying hard for just a little longer: It takes time to truly
       | understand the context and form an own point of view. I take time
       | to find quality reference documents. I take time to do a few
       | experiments. I take time to write down and order my thoughts.
       | Asking someone if required when I have done my homework then
       | yields faster and more effective responses. I get higher level
       | responses that complement and extend my groundwork. Even if I
       | believe I know the answer I find asking can help if only to
       | establish and deepen relationships. Ultimately it moves me in a
       | position where others come to me.
       | 
       | Of course doing a submarine dive for weeks is never good except
       | to serve as a straw-man for a blog post .
        
       | TameAntelope wrote:
       | I'm honestly surprised Jeff Atwood's excellent blog post about
       | this hasn't been linked. [0]
       | 
       | From his article: "It's effectively impossible to go dark if
       | you're practicing any form of agile software development."
       | 
       | There are a _lot_ of psychological reasons to  "go dark", but
       | very few (if any) solid business reasons.
       | 
       | [0] https://blog.codinghorror.com/dont-go-dark/
        
       | [deleted]
        
       | blindmute wrote:
       | I'm of the opinion that if the problems outlined in the article
       | happen, it was because of poorly defined work. A senior engineer
       | should be able to work on something with no communication for a
       | week and it be correct. If it isn't correct, the work was not
       | defined correctly prior to starting the work. Daily updates and
       | frequent collaboration are not the solution; they are a stopgap
       | masking unclear requirements.
        
         | TillE wrote:
         | That's basically true, but I don't think anyone has a good
         | general solution to unclear requirements besides constant
         | communication and fine-tuning, a la XP/Agile.
         | 
         | I like working on a module with interfaces and behaviors which
         | are set in stone, but I find most of my work is a lot more
         | exploratory than that, so the "clear requirements" can only
         | come after it's about 90% done.
        
       | pcmaffey wrote:
       | The challenging part of this is that knowledge work is intangible
       | and uncertain. Showing progress is difficult, especially with low
       | context. So we want things to be perfect or finished or at least
       | to scope. There's a lot more that goes into our work than
       | commits, PRs, and completed tasks.
       | 
       | Second, "showing your work/progress" should be async. Otherwise,
       | it's taxing for both parties as it requires a request and then
       | some sort of feedback.
       | 
       | People though are generally curious and want to know what others
       | are working on, if they can help, how it aligns, etc. Having that
       | ongoing visibility into each other's progress makes it way easier
       | to build off each other.
       | 
       | What we need is a simple, async way to share progress--outside
       | the scope of tasks or timelines.
        
       | babycake wrote:
       | To be honest, I don't think this is any of the engineer's fault.
       | I think we're an open creature by nature; we like to share and
       | explore ideas with others.
       | 
       | In the corporate field, what I've observed is that deliveries are
       | most important. Not just any deliveries, but the project has to
       | be big and "impactful" (as in, other teams use it too), and you
       | personally have to own it. Like your name has to be attached to
       | it. No one is going to remember your tiny fixes here and there,
       | or tiny feature implementations in the larger system, even if
       | it's tracked in sprint. All that stuff gets looked down upon as
       | just 'doing your job'.
       | 
       | To get any kind of recognition and ultimately, a promotion (or
       | better raise, better rating, better bonus, etc), we absolutely
       | have to clam up and take entire ownership of the work. If that's
       | not done, other people can swoop in and steal the work. Things
       | become need-to-know basis for your other fellow devs, design
       | meetings is just you leading them and asking if this is fine,
       | etc. Everyone has to know you're leading the project, and you
       | have to constantly enforce that knowledge to put down any attempt
       | at a takeover.
       | 
       | I've personally witnessed this happening to an older and more
       | senior dev when a college graduate tried to assert himself on the
       | team until the senior dev fought back with office politics.
       | 
       | In the end, office politics is what matters, along with your work
       | to back up your office political agenda. Another senior dev could
       | come in and take your project, claim your code is terrible and
       | needs a rewrite, etc. You can only win if the boss is on your
       | side, and that requires you to take on more than you can chew
       | (and of course, deliver it all) to get on the boss's good side.
       | 
       | Imagine if we didn't have that kind of pressure of delivery in
       | the workplace just to get recognition. The first example that
       | comes to mind is Open source work. People just contribute, we
       | share and deliver openly, and as a result community projects grew
       | so big our entire corporate infrastructure became dependent on
       | it.
        
         | quickthrower2 wrote:
         | > Imagine if we didn't have that kind of pressure of delivery
         | in the workplace just to get recognition.
         | 
         | While the places I have worked might have a tiny element of
         | this your situation sounds extreme.
         | 
         | What I have seen is yes you do have to do "perception"
         | management to keep a pulse on "how am i rated".
         | 
         | Having a few long time trusted people vouch "this person is
         | good" helps and all you need to do is work with them and show
         | that you are good, both in attitude and capability.
         | 
         | However your description sounds like a dystopian "house of
         | cards" scenario that I would be looking for another job asap.
         | If the programmers are more like politicians that is very odd
         | and a bad sign.
        
           | babycake wrote:
           | I should clarify this behavior is mostly at larger
           | companies... and although it's my anecdotal piece, it is what
           | I've consistently seen at different companies and what my
           | friends tell me they've experienced at other large companies.
           | I've also worked at smaller places and this behavior was not
           | as prevalent since everyone knows everyone on the dev team.
           | 
           | Also, at larger companies your manager tends to reorg. I've
           | gone through 5 managers in a single year before. And with
           | them goes all the goodwill you built up during that time. New
           | manager comes in, and it basically resets your 'perception'
           | factor. The old manager might tell the new manager that some
           | people are good, but you have to get lucky to get the new
           | manager to care, because they haven't seen the results with
           | their own eyes yet. That small time window is when it's ripe
           | for someone to swoop in and claim ownerships of projects,
           | while smooching up to the new manager. That's what happened
           | with the senior dev I saw, but he had aces up his sleeves.
           | What an epic showdown.
           | 
           | Yea, I should leave probably, but it's just one burning ship
           | to another. That's our fundamental reality.
        
       | stephenboyd wrote:
       | I can't imagine anyone on my dev team or the others at my company
       | being able to spend multiple weeks consecutively on vaguely
       | defined unplanned work. We collaboratively make a plan with
       | product management covering many weeks of work (PI planning) with
       | some date commitments on milestones we expect to achieve. Anyone
       | spending a more than a few days on unplanned work risks making us
       | need to revise the plan that we all made together, so we don't
       | want to do that because the opportunity cost is obvious.
        
       | quickthrower2 wrote:
       | One way to address is for the manager to make sure the work is
       | chunked down.
       | 
       | Where I see the mentioned problem the most is when teams are too
       | busy. The manager (as in team leader) is putting out fires and
       | does not have the time and/or will to mentor and direct the team
       | members that go off track.
       | 
       | I think it is everyones job to make sure they are not too busy.
       | Being too busy for basic processes is an antipattern and flag
       | that things need to be reprioritised. Someone needs to walk away
       | from the screen (or in covid times towards it) and talk to their
       | boss!
        
       | kinakin wrote:
       | We see this with engineers of all ages, but especially with new
       | grads. All have just spent 16 to 22 years working under a model
       | where: you get an assignment, you come up with a solution, you
       | are marked on your result, and then you move on...
       | 
       | Our education has trained us that involving others is something
       | done at the end.
       | 
       | A lot of our new hires need help shifting their approach (and
       | getting over insecurities) to consider that all their products
       | need iterative review well before the work is complete.
        
         | mkaic wrote:
         | I'm not a new dev (but I am a new data scientist) and can
         | definitely relate to what you said. I'm so used to "if you get
         | stuck, just figure it out" as the norm for things I'm assigned
         | to do, and getting used to "I'm stuck, I should reach out to
         | someone who's more experienced than me" has been difficult. I'm
         | always afraid of inconveniencing or interrupting my higher-ups,
         | even though they never seem to be bothered by it. I guess it's
         | just an irrational social fear.
        
       | strict9 wrote:
       | Insightful article but surprised at the recommendations. Teamwork
       | is important, yes... but smaller task sizes should have been
       | mentioned too.
       | 
       | > _Finally, after several weeks, the engineer shares an update,
       | and one (or many) of the following bad things transpire:_
       | 
       | Several weeks? If you are giving developers open-ended tasks that
       | take weeks or more to complete, imo it's asking for things to go
       | off the rails.
       | 
       | The most effective way I've found to avoid this situation is to
       | ensure that worked assigned is broken down into tasks that are as
       | small as possible.
       | 
       | When assigned work is limited to small deliverables you get
       | smaller PRs, limited business logic changes to get lost in, fewer
       | integration changes, etc.
        
         | jbay808 wrote:
         | I'm currently realizing that laying out a moderately complex
         | PCB can take more than a week, but there's not much to be
         | gained from breaking it up into smaller pieces. You kind of
         | just have to _do_ it.
        
           | bob1029 wrote:
           | Some problems are impossible to subdivide in a practical way.
           | Having a team that can respond dynamically is really the only
           | general solution I've ever seen.
        
       | duxup wrote:
       | Sometimes it is really hard to know that you've been out in the
       | weeds for a while until you're there.
        
       | bob1029 wrote:
       | I am stuck with a delicate balancing act around this one.
       | 
       | Our organization arguably would not exist today if it were not
       | for developers doing "too much" work on things before bothering
       | others. Our product would certainly be worthless trash today if
       | we had to design by committee for every feature. We took
       | extraordinary risks that simply could not have been planned into
       | reality. Most of those risks were taken by individual
       | contributors without anyone being explicitly aware of the
       | magnitude of those risks.
       | 
       | There is a price to be paid for asking permission. Especially if
       | your team members lack the same vision/ambition and are unable to
       | conceptualize the path you laid out. Clearly, this is a problem
       | for both parties, but it is a big reason to sometimes go off on
       | your own, build a whole goddamn thing in peace, and _then_ show
       | it to the team. When others see a _complete_ solution, even if
       | its not 100% what the business wanted, it makes the conversation
       | substantially more productive. It 's the fear of the
       | unknown/unseen that makes project managers nervous in my
       | experience. Why start a hard thing at all if the conclusion is
       | ambiguous at best?
       | 
       | On the other hand, we lost ~4 major customers to technical
       | iterations over time. This was something we could have avoided by
       | polishing what we had at the time. Problem is, that thing we
       | would have polished was an abject failure in terms of strategic
       | sustainability for the organization and our customers at scale.
        
         | TameAntelope wrote:
         | I think it's telling when you call this "asking permission".
         | You should never need to "ask permission" to give customers
         | some small amount of value with a short turnaround.
        
       | pphysch wrote:
       | There's also the flip side to this, "doing too little work before
       | looping in others". Management brings overhead. Meetings bring
       | overhead. Not every (sub)project needs multiple ICs.
       | 
       | That said, I think the E2E MVP/"tracer bullet" approach is a good
       | compromise. It sets a clear milestone, which could be achieved by
       | a single IC, but which provides something tangible for a team
       | effort to build on (or meets intractable obstacles and and dies
       | prematurely, saving everyone time before the PM engine is spun
       | up).
        
       | billforsternz wrote:
       | I chronically suffer from this problem. For example I started
       | working on my chess software in 2008 and just yesterday someone
       | raised an issue on GitHub asking me about pertft(). Gulp.
       | Fortunately it turned out my chess logic does pass that very
       | specific, very easy to check correct/not correct test. But it
       | would have been much better to have checked I was building on
       | solid ground 13 years ago!
        
         | aix1 wrote:
         | Sorry, what's pertft()?
         | 
         | (Could be a straightforward typo, but I'm not seeing it. Also
         | clearly not important to understanding your point, but I'm just
         | very curious.)
        
           | billforsternz wrote:
           | Whoops perft() sorry.
        
       | escapedmoose wrote:
       | But I don't _wanna_ talk to the other kids. :I
        
       | emptysongglass wrote:
       | The longer I work in this industry the more I reflect on the
       | value of all this accretion of process: Agile, Scrum, PI
       | planning, daily stand-ups are counterproductive to real work. So
       | much of it, the sprints, the retroactives, the sprint planning,
       | feel like taking place in the stead of real work. (I reached for
       | the common "instead" of here but wanted to emphasize the work
       | being removed or substituted by not-work).
       | 
       | Real, deep work, is largely a solo affair. Teamwork is trusting
       | your team that they will do their work.
       | 
       | I can think of only two processes which truly requires
       | communicating over real, smell-that-earth honest work. That is:
       | seeking counsel and asking for help because you are well and
       | truly blocked. For the latter, the process of learning enough to
       | become unblocked, even if it takes a long time, can make the
       | practitioner a better software developer forever vs the shortcut
       | of a quick, "do you have a minute" disruption to another
       | developer's time.
       | 
       | Gumroad's philosophy and practice of work [1] struck a chord with
       | me. No meetings, no deadlines. Just a commitment to production,
       | whatever the method, whatever the schedule.
       | 
       | [1] https://sahillavingia.com/work
        
       | aetherspawn wrote:
       | I think this can be done on purpose though.
       | 
       | In some orgs, if you don't step around the problem carefully so
       | as to not be "done" immediately with a proof of concept, it might
       | get shipped to the customer from underneath you.
        
       | thrower123 wrote:
       | I've never known any serious work to actually get done without
       | people "going dark" to actually accomplish it.
       | 
       | The constant statusing that doesn't allow one four hours of
       | uninterrupted concentration is demoralizing and grinds progress
       | to a halt. There's a reason more code is authored between 9pm and
       | 5am than between 9am and 5pm, but that wears engineers out badly.
        
       | xbar wrote:
       | This is really good, but I feel like you should have come to us
       | with this topic sooner.
        
       | JamesBarney wrote:
       | > Encourage engineers to get something end to end launched
       | internally as quickly as possible.
       | 
       | Pragmatic programmer called this a "tracer bullet".
       | 
       | https://builtin.com/software-engineering-perspectives/what-a...
        
       | sdoering wrote:
       | I was more often than not 'guilty' of what the author describes.
       | And I actually love being the lone detective on the hunt for a
       | cool solution.
       | 
       | I am not a dev by trade (data analyst) but still love to work on
       | problems solved in code.
       | 
       | A lot of the advice hit home, but what struck me was this part:
       | 
       | > Encourage engineers to get something end to end launched
       | internally as quickly as possible.
       | 
       | This is something my boss never ceases to tell us. When we build
       | something we shall strive to have some first small thing end 2
       | end done as soon as possible. Rough around the edges, not
       | refactored, code being repeated - all fine. But it has to work
       | end to end.
       | 
       | Because we can brush it up and make it stable later. Because when
       | starting we only have a vague feeling for the problem space and
       | we need to learn the lay of the land by navigating it.
       | 
       | I will always cherish this advice.
        
         | kitsunesoba wrote:
         | The frustrating thing is when only the first half of this
         | philosophy (ship now, fix/polish later) is adhered to, where
         | things get shipped frequently but seldom followed up on. The
         | incentive to finish things needs to be strong for not only the
         | engineers but also for the product teams and managers directing
         | them, but as far as I can observe this is exceptionally rare --
         | in fact it almost seems like the norm for non-engineers to push
         | for shipping new features over polishing older ones. A lot of
         | the engineers I know would love nothing more than the
         | opportunity to polish the project they're responsible for to
         | perfection, but are never given the chance.
        
           | aimor wrote:
           | I agree, but I've also tried to polish things without a
           | strong need and it's difficult. The work can feel burdensome,
           | useless, undirected, and sometimes requires major changes
           | that can't be done (without inflating the scope of the work).
        
           | sdoering wrote:
           | I agree. I know that the freedom to create sensible
           | architecture is a privilege.
           | 
           | Even if other things may not be perfect (but what job is
           | perfect in all areas), my boss knows the value of refactoring
           | towards a stable and maintainable architecture while keeping
           | a reasonable schedule for shipping.
        
           | danielmarkbruce wrote:
           | If you can present a metric which shows that said thing is
           | bad on some dimension, and explain why it's bad for the
           | customer (/business) and why what you will fix will improve
           | it, and how much work is involved, you'll have a better
           | chance of moving it through.
        
         | beerandt wrote:
         | It might be good advice, but that's not engineering in concept,
         | spirit, or practice of the term.
         | 
         | I don't usually pick an absolute, decisive side in the "what
         | counts as engineering" debate, but this is the opposite of
         | engineering.
        
         | crehn wrote:
         | This should nearly always include writing integration tests
         | (that run on every change) to ensure you can refactor with
         | confidence.
         | 
         | If there are no tests, the team will waste a ton of time
         | anxiously monitoring and reasoning about the messy code and the
         | impact of their changes.
        
           | sdoering wrote:
           | I do. I even implemented tests for tracking code to be
           | developed locally (including mocks).
           | 
           | This way I'm able to quickly and confidently refactor as well
           | as add to existing tracking code (web analytics).
        
         | swagasaurus-rex wrote:
         | I find when this happens, it never gets refactored. The edges
         | can be smoothed, but the architecture is dried and hardens into
         | something that needs to be worked around by everybody else
         | touching the code. The easiest way to solve the issue becomes
         | the only way.
        
           | zoomablemind wrote:
           | Depends on a team, of course. But happens often with business
           | solutions. Done, whichever way. Next. It broke down in prod?
           | Well, go fix it, it's yours now...
        
           | sdoering wrote:
           | My experience differs. But maybe because I love to refactor
           | and create a clean architecture.
           | 
           | Also I learned a lot from my boss' refactorings. Before that
           | I never would have imagined how far a good abstraction can be
           | driven.
        
         | aimor wrote:
         | I still find it amazing how many "first small thing end to end"
         | wind up being the last major version for years. That's not a
         | bad thing, I've grown to love it, and I think it's a tenet I
         | should make a more conscious effort towards.
        
       | Ensorceled wrote:
       | I have two big rules for developers that report to me:
       | 
       | 1. The 5 minute rule. If you are stuck for more than 5 minutes
       | reach out. Once the developer is on the team for a while, this
       | becomes 15 or 30 minutes.
       | 
       | Caveat ... truly stuck ... tried a couple of things, googled,
       | tried some more ... wondering what to try next.
       | 
       | One thing I try to do with a new start is go ask them for help in
       | the same way, "Hey, 5 minute rule, I'm think I'm missing
       | something simple here."
       | 
       | 2. Project Initiation Memo
       | 
       | The is NOT a PRD, it is a high level "I think this is what I'm
       | supposed to be doing on this project and why". It might turn into
       | a PRD if one is warranted. It's really just a "did you understand
       | the problem correctly"
       | 
       | I've avoided so many massive f'ups or developers drifting into
       | silent frustration for hours with these two rules.
        
         | ketzo wrote:
         | What's a PRD?
         | 
         | Love the five-minute rule, by the way. I tried to apply that a
         | lot especially when I was just starting at my job. So many
         | things that I would spend two hours trying to fix, only to be
         | told the next day that we had a super simple internal process
         | to fix that thing.
        
           | Ensorceled wrote:
           | Product Requirements Document ... a full specification of
           | everything the software needs to do.
           | 
           | Sometimes VERY detailed, sometimes not so much.
        
             | TameAntelope wrote:
             | They could probably just write this in code, and save a lot
             | of time.
        
       | PaulHoule wrote:
       | I've gotten in trouble too, particularly in open source projects,
       | showing off a half-baked prototype that doesn't really prove the
       | concept. If you need to win people over and it's a tough fight
       | you need to be in a strong position.
        
       | markus_zhang wrote:
       | Actually, if we turn the perspective and look through the
       | developer's eyes, the behavior makes a lot of sense.
        
       | irrational wrote:
       | > Throughout this initial period there are standup updates of the
       | form "I'm exploring X, or working through problem Y, but should
       | have something for others to take a look at soon"
       | 
       | What is really going on is the developer has basically been given
       | permission to not turn anything in. They are spending maybe an
       | hour a day actually exploring/working on the issue and the rest
       | of the day they are working on their own pet projects, playing
       | games, watching netflix, whaterver. Heck, they might even spend
       | just one day doing all their "exploring" and then see how long
       | after that they can just show up for standup and extend out the
       | "exploring" phase while doing whatever they want the rest of the
       | day.
        
         | leeoniya wrote:
         | it really depends on what you're working through.
         | 
         | i do this on occasion while experimenting and thinking through
         | an architectural design. what matters is whether the end result
         | is representative of the time spent on iteration and writing
         | thrown-away prototypes. i will often not start writing code
         | until a reasonable path is formed in my head, and then i may
         | write a prototype that doesnt work out and have to loop back
         | and rethink various aspects. it may take a week with nothing
         | but vague updates in daily standups, but then something awesome
         | to show that has gone through a bunch of private "pre-alphas".
         | 
         | > For more senior engineers, it can happen because they like to
         | work on their own and may be overconfident in finding
         | solutions.
         | 
         | this really only applies if you:
         | 
         | A) dont have a history of delivering quality solutions to non-
         | trivial problems
         | 
         | B) refuse to ask for help/feedback when you actually need it
         | 
         | typically, the rest of the team is working on other things.
         | there would be little value in me pushing various crappy
         | prototypes just for the sake of providing updates that only
         | serve to distract people with information that will be out of
         | date in 24hrs. "too many cooks in the kitchen" is a real thing,
         | too.
        
         | salt-thrower wrote:
         | I think that's an overly harsh take. I've fallen prey to the
         | pattern the author describes many times, and I inevitably end
         | up making updates like that because I feel bad that work isn't
         | getting done, which fuels a procrastination doom loop of
         | anxiety and avoidance until I rip the bandaid off and hustle to
         | make up the missing work.
         | 
         | It sounds like you've never experienced this, and that's great
         | for you, but don't discount what the author is saying. It rings
         | uncannily true to me, and it sucks when it happens.
        
           | nuancebydefault wrote:
           | Exactly. It is very easy to fall into the trap the author
           | describes, for junior as well as senior engineers. Managers
           | should ask for feedback early on in the process. This could
           | be a first draft of the architecture or even a simple bullet
           | list of assumptions and considerations. A look at that info
           | by a fellow engineer or a product owner can highly impact the
           | set of requirements, the design or the way of implementing.
        
       | alexfromapex wrote:
       | I've been guilty of this at times but what I would add is a
       | certain type of environment encourages this behavior. If the
       | business or teammates are very reluctant to let engineers work on
       | what they want or give harsh feedback it encourages people to
       | retreat into their safe space and try to create something they
       | feel is worthy of feedback.
        
         | Phelinofist wrote:
         | Can confirm. My lead is pretty picky with everything and
         | expects 110% correctness. Even if my solutions works, is
         | maintainable and extensible it is not how they would've
         | implemented it, so it's no good. Argumentation is sometimes
         | pretty artificial where some made up rules are the gold
         | standard. That plus comments like "that is bad style" (for
         | something that I've seen in all my past jobs + in a lot of OS
         | code) make me not really want to loop them in.
         | 
         | But the job pays well and has interesting problems to solve, so
         | I guess I will put up with it for some time more.
        
         | Steltek wrote:
         | I think there's a new phenomenon that needs to be addressed:
         | poor WFH communication channels. By encouraging radio silence,
         | so as to not "interrupt anyone", things get missed.
         | 
         | Also some people feel the need to tightly control group chat.
         | Either content (no "offtopic"), membership, or # of rooms. Some
         | chat platforms encourage this by restricting who can
         | create/manage rooms or how rooms are linked together
         | (discoverability).
         | 
         | It's an unexplored area of knowledge for most people in the new
         | WFH life everyone's leading.
        
         | Buttons840 wrote:
         | Yes. I do this because interactions with others are a net
         | negative at my place of work. In terms of quantifiable rewards,
         | 99% of interactions are +5 or +10, etc, mixed in with the
         | occasional -15000. In the end the expected value of
         | interactions is negative. All because of one or two very bad
         | interactions a year; the rest being positive, but close to
         | neutral.
        
           | Cederfjard wrote:
           | What kind of interactions are those extremely negative ones,
           | if you don't mind elaborating?
        
             | Buttons840 wrote:
             | Most recent was learning we weren't implementing something
             | in the way that was expected, which required a lot of
             | rework and sparked conversations among management that our
             | team was incompetent. We were completely blindsided by it
             | all, leading to a feeling that any interaction might
             | randomly turn into a similar debacle.
             | 
             | But, when things go well they say "good job", so that's
             | nice.
        
         | disposableuname wrote:
         | The original post contains
         | 
         | > It can also happen if the team culture is toxic and engineers
         | fear getting criticism early in the design process.
         | 
         | I think the author would agree with you.
        
           | zachlloyd wrote:
           | i do agree
        
         | vanusa wrote:
         | Y-e-p. It's not like these retreats happen in a vacuum.
        
           | folkhack wrote:
           | I'll be honest - half the time it's trying to keep it from
           | other engineers who are overly eager to have an opinion
           | because a) they're low-output and looking to posture, and/or
           | b) or want things to be done a different way.
           | 
           | At least the business side of the house appreciates the
           | spec'd work being accomplished.
        
             | yjftsjthsd-h wrote:
             | Intentionally not communicating things in order to prevent
             | bikeshedding is a dangerous game to play and a symptom of a
             | broken environment, but that doesn't mean it's not
             | sometimes a valid approach.
        
               | folkhack wrote:
               | Agree - and it 100% comes from broken
               | teams/environments/people. In engineering, I find most
               | teams are more invested in tearing each other down more-
               | so than building each other up - that's admittedly very
               | anecdotal and personal to me.
        
         | bryanrasmussen wrote:
         | Or if teams are uncommunicative you can end up with not getting
         | a usable response on concerns raised, need to march at some
         | point and without feedback you decide to march in the direction
         | that seems most reasonable to you. Later on it turns out that
         | was right into the swamp.
        
       | retinaros wrote:
       | yeah. i agree it is a mistake. but I got many times sidelined or
       | robbed of an idea or a project after starting it and involving
       | other people too early. it happened for instance that I started
       | developing a GDPR tool mentioned it to my manager, he then told
       | me a few days later that there was a manager working on this and
       | it was in the making. the manager in question never had anything
       | on the topic, did not start anything as well. two weeks later he
       | had a power point and hired an intern << to work on this topic >>
       | he presented the deck to VPs, every one clapped said it was
       | amazing. I had the full mvp working - demo-able and he was
       | supposed to be the one leading this after this presentation.
       | 
       | so I guess id rather do too much work before looping in others
        
       | AtlasBarfed wrote:
       | When you are doing idea creation and getting your head around an
       | idea, I don't know about other people, but in addition to not
       | being well quantifiable and structured (which standups and their
       | tickets need), but looping in other people in the IT industry
       | exposes you when you most look like an idiot.
       | 
       | It's the same reason IT interviews are this big cockpuff show.
       | Everyone is insecure due to a combination of impostor syndrome,
       | constant tech churn undermining your expertise, stack ranking
       | culture, our industry archetype of socially unskilled/introverts,
       | projection of bullying from schooling, etc.
       | 
       | So it comes down to functioning social dynamics in your group:
       | people not trying to elbow other people in stack ranking, helping
       | out, being eval'd fairly, etc.
       | 
       | Things, you know, that IT companies and manager generally aren't
       | good at because technical understanding and achievement is
       | paramount.
        
       | zachlloyd wrote:
       | I'm the author of the post - would love any feedback / similar
       | experiences / contrasting opinions!
        
         | friendlydog wrote:
         | I'm a fan of "always loop people in".
         | 
         | Frequent checkins with detailed commit messages including
         | markdown and graphviz diagrams which state intentions.
         | 
         | Switching the flow from a status meeting low detail reponse of
         | "still working on X issue" to a regular feed of detailed
         | information which serves not only as a development log,
         | documentation, but it crystallizes the developer's planning and
         | thought process because they have to describe what they are
         | doing rather than just "fixing the issue" , or "building the
         | thing".
         | 
         | Persistent chat has made daily stand up status calls redundant.
         | Stakeholders can subscribe to channels which have rich detailed
         | information about what is happening at any given moment. For
         | larger groups a resource can curate the channels and provide a
         | thoughtful summary in a higher level channel of different teams
         | progress. Tools like Azure Dev Ops provide meaningful charts,
         | tracking, and velocity, and the deeper conversations on chat
         | linked to work items, wikis, and repo level filea serve to
         | provide an accurate picture for anyone looking into the effort.
         | Leads, and managers can identify trouble spots and adjust
         | priorities or provide valuable insights. Regular demos can also
         | be linked and serve as a historical record of the development
         | direction.
        
         | grumple wrote:
         | I'm getting a 500 error when I visit the site.
        
         | theandrewbailey wrote:
         | I'm not sure what IC means. Integration Consultant? Industrial
         | Control?
        
           | conro1108 wrote:
           | Individual contributor (as opposed to management)
        
             | zachlloyd wrote:
             | Correct! IC == individual contributor. Sorry for any
             | confusion
        
           | juice_bus wrote:
           | I believe IC is "Individual Contributor" in this context.
        
             | ilrwbwrkhv wrote:
             | A most bizarre terminology the industry has come up with.
             | Almost feels a bit derogatory.
        
               | zaat wrote:
               | That's the natural way languages develop, offensive terms
               | replaces with euphemisms, given some time every
               | euphemistic term become loaded with the same negative
               | connotations of its origin and new euphemism get
               | introduced.
               | 
               | see:
               | https://thelingspace.tumblr.com/post/114432905996/the-
               | euphem...
        
           | mLuby wrote:
           | Individual contributor, in other words a worker as opposed to
           | management. The author's using engineer to mean software
           | developer; they're the workers in this context.
        
           | alboy wrote:
           | Itty-bitty Cog.
        
           | disposableuname wrote:
           | > as both an IC and a manager
           | 
           | When juxtaposed to manager, it usually means individual
           | contributor - someone being managed rather than doing the
           | management.
        
         | waynecochran wrote:
         | I am an older software engineer and have noted that a lot of
         | introverted engineers love to work in their own silos. Some of
         | the smartest engineers are introverted and do not want to be
         | bothered; worse yet, because of pride they often do not "suffer
         | fools" well and avoid working with others. Working with a group
         | of smart and _humble_ engineers that are constantly  "borrowing
         | each other's" brain is very effective and enjoyable experience.
         | And everyone has a good sense of what everyone else is working
         | on -- sunk cost is more frequently avoided.
        
           | nuancebydefault wrote:
           | I feel the same way. Lot's of experienced engineers don't
           | like to be bothered too much, have the feeling they know best
           | and just design and implement the way they have it in mind.
           | Juniors on the other hand don't like to bring their beginners
           | mistakes too much in the open, hence they work hard and long
           | to avoid that. Both of these situation are largely sub-
           | optimal. A good manager knows this and asks for feedback in
           | time, in an interested way, without being too pushy.
        
         | jkaptur wrote:
         | It's great to see "I'm still exploring X" called out as a
         | standup antipattern. I've heard and (hi Zach!) said this many
         | times.
         | 
         | ... But I've generally heard it most frequently from the tech
         | lead and/or manager at the standup. It's easy to justify: "as
         | the TL/M, my work is ill-defined, meeting-heavy, complex,
         | externally-focused, and long-term! I'm not just building a
         | feature! It's hard to describe!"
         | 
         | In my experience, this culture percolates with lightning speed:
         | more junior folks immediately understand that to be senior and
         | high-status is to give vague updates (often with a dramatic
         | sigh and a self-deprecating joke about getting nothing done).
         | 
         | So it's good to exhort feature-building ICs to show incremental
         | progress on that feature, but I think this article should have
         | a heavier focus on the most senior folks at the standup.
        
         | eatbitseveryday wrote:
         | Please write the insight into the title of the post, rather
         | than hiding it under a click-bait. Your site is down now due to
         | traffic and the original HN title (reflecting the title of your
         | writing) provides no value.
        
           | zachlloyd wrote:
           | yup, i messed this up, apologies. site is handling the
           | traffic better now thanks to cloudflare
        
         | jseban wrote:
         | The description of the "problem" is that the requirements
         | specified in the beginning were wrong, and then the developer
         | is blamed for solving exactly what was specified, and not
         | constantly asking management every day "have you changed your
         | mind?". I don't understand at all, how this is the fault of the
         | developer, talk about expecting the developer to bend over
         | backwards for any product manager. How is it not reasonable for
         | management/PO to be responsible for 1. sending devs off in the
         | wrong direction, and 2. not notifying them as requirements
         | change?
         | 
         | This is just another way of saying "management is right, even
         | when they're wrong, and you need to accept that".
        
           | Jabbles wrote:
           | Non-trivial problems often require exploration of the
           | solution space. You're not expected to ask management if
           | they've changed their mind, you're meant to present your
           | finding so far, and ask if they have any feedback.
           | 
           | Simply stating that you did as instructed is not a viable
           | excuse for a human, that's not what they're paying you for.
           | Computers can get away with it.
        
             | jseban wrote:
             | > Simply stating that you did as instructed is not a viable
             | excuse for a human, that's not what they're paying you for.
             | 
             | Getting paid for doing what someone tells you to do, is
             | literally the definition of a job. What you're saying
             | actually, is that it's not your job to do your job, it's
             | your job to also do the managers/PO's job.
        
         | 908B64B197 wrote:
         | In this industry we use "developer" and "engineer"
         | interchangeably, but one is not like the other. They don't hand
         | out brass rats at the end of a bootcamp...
         | 
         | > For early career engineers, it often happens because they
         | lack practice working on teams. They train in school
         | environments where they do classroom projects on their own, or
         | work on long-term intern projects in a silo.
         | 
         | Serious engineering school would have student work together to
         | ship projects.
        
           | afarrell wrote:
           | Yes, MIT's university culture does genuinely encourage a
           | collaborative project-based approach. However, some grads
           | will believe that the business world expects them to be as
           | brilliant as Tony Stark and able to "carry a message to
           | garcia"[1]. If a course-VI grad wearing brass rat thinks a
           | request for help/feedback will be rebuffed as impostor
           | syndrome (it happens), they can make the same mistake. Ego is
           | the enemy. The blog post's advice still applies.
           | 
           | [1] https://courses.csail.mit.edu/6.803/pdf/hubbard1899.pdf
           | which is both historically apocryphal and only good advice
           | when dealing with an impatient and incurious leader.
        
       | newsbinator wrote:
       | > the biggest mistake I see engineers make is doing too much work
       | on their own before looping in others.
        
         | eatbitseveryday wrote:
         | Thank you... frustrating we do not help by putting the
         | statement into the title and write "bait-like" wording to get
         | clicks and traffic. Now also the server is down so I get no
         | value and no insight.
        
           | dang wrote:
           | It's sort of a reproductive strategy thing, only about
           | attention. As I say about headline writers in media, it's
           | their job to sex up the title and our job to knock it back
           | down to size.
        
       | zoomablemind wrote:
       | The author obviously draws on own experience, thus the
       | conclusions. However, an important aspect is the team and the
       | process, not just the dev and their behavioral patterns.
       | 
       | If a "loosely-spec'ed" feature is assigned to a single dev for
       | implementation, then there must be either reasonable expectation
       | that it could be delivered solo or that the blanks are not
       | critical for the result.
       | 
       | Either way, such "pattern" of a supposed dev-vs-team antagonism
       | may be pointing rather at process deficiencies or disbalanced
       | expectations from management.
       | 
       | When team management believes that all is clear as day and could
       | be done in a week-span, the devs may have a hard time affording
       | themselves a prototype just to figure out what is there to do, so
       | delaying the feature delivery is a simple hedge.
        
       | taurusnoises wrote:
       | Not a developer, like, at all. But, I see this in myself when I
       | work in groups all the time. I get excited about the project,
       | forge ahead on my own, come back with so much stuff, into which
       | everyone else now needs to "fit". At which point the entirety of
       | the collaborative intention is missed.
        
       | gorjusborg wrote:
       | https://archive.is/ZFwUh
        
       | 24thofjan wrote:
       | I'm curious about Zach's thoughts on how to use Github. Merge or
       | rebase?
        
       | 3pt14159 wrote:
       | This is a bit of a nuanced topic with lots of shades of truth or
       | context, and overall I agree with the article, but that said:
       | 
       | Sometimes you know your team is going to do the stupid shortcut
       | if you let them and you save them from themselves by solving the
       | robust solution before they have a chance to "be pragmatic" and
       | pointlessly bikeshed about things that don't matter to waste your
       | time. Sometimes you know it will take you a week to do it right
       | or a week with input to do it half right and you just bite the
       | bullet and do it right the first time and, to the articles point,
       | suffer the consequences if or when you get it wrong or partially
       | wrong.
       | 
       | Realpolitik is part of being a senior engineer. Sometimes you
       | make the call to take the shortcut without mentioning it,
       | sometimes you force the full solution with the big PR (or, even
       | worse, a series of staged small PRs to make it look like you're
       | taking feedback); but most of the time, if you're working
       | somewhere good, you get to be completely transparent about what
       | you're working on and the feedback you get is corrective and
       | flexible.
        
         | Slartie wrote:
         | I have found that the attitude of "just silently do the robust
         | and proper thing immediately and push it, instead of letting
         | the entire team discuss this important infrastructure topic
         | forever in order to ultimately come up with an abomination of
         | design-by-committee-architecture, just to then find out that
         | the remaining time now is way too short to implement it, which
         | is why they then take all the stupid shortcuts to get it done
         | in time, ending up with something barely holding together with
         | duct tape that somehow works for the moment, but immediately
         | tumbles down as soon as the next guy tries to build the next
         | layer on top of it" is a very important senior dev skill,
         | especially at the beginning of new projects when a lot of basic
         | building blocks on which the more complex features have to rest
         | later are still being created.
        
         | TameAntelope wrote:
         | The reality is that it's not your call, it's the customer's
         | call, and you need to stop trying to make a decision _for_ the
         | customer. Let them tell you what they want.
        
       | davidhyde wrote:
       | > "the biggest mistake I see engineers make is doing too much
       | work on their own before looping in others"
       | 
       | > "For more senior engineers, it can happen because they like to
       | work on their own and may be overconfident in finding solutions.
       | It can also happen if the team culture is toxic and engineers
       | fear getting criticism early in the design process."
       | 
       | Not saying the above statement is incorrect but here is an
       | alternative explanation that is also viable: Senior Engineers are
       | often hired into large large projects so that the company has the
       | capability to address emergencies or modify the existing system
       | accurately as it is often more difficult to work on a large
       | complex code base than to build a new one from scratch. Those
       | engineers sometimes never get to work on greenfield projects and
       | "doing too much work on their own before looping in others" is a
       | way to scratch this itch without the opportunity being taken away
       | prematurely. It also offers chance to produce memorable work as
       | nobody remembers the set of 3 point tasks you completed ten
       | sprints ago.
        
         | philote wrote:
         | In my case, I'm the senior engineer and the rest of the team
         | are juniors. There's generally not much I can ask them that
         | they'd know the answer for. On the other hand, looping them in
         | is a good learning experience for them even if they can't help
         | me solve the issue. But due to time constraints that isn't
         | always possible.
        
           | EGreg wrote:
           | You nailed it. Senior engineers build things on their own
           | because their company can't afford to hire enough advanced
           | enough people who can learn the system and take over the work
           | without being trained for 6-12 months, and often there is no
           | budget for this kind of "distraction" from the core
           | moneymaking path.
        
         | abofh wrote:
         | You are not wrong. I generally sell as a mercenary, and prefer
         | it that way - I've been doing this longer than some of my
         | managers have been alive. I'm paid just as well if they want to
         | "pair program" or jira the whole process, but yeah, you hired
         | me to fix a problem - if you _are_ the problem, I get paid just
         | the same.
         | 
         | Welcome to the real world, if your work is interesting, the
         | clock might not turn on when I'm having fun. If your work is
         | bullshot, I bill tighter than my lawyer
        
           | Victerius wrote:
           | > I've been doing this longer than some of my managers have
           | been alive.
           | 
           | In what organisation do 25 year olds manage 50 year olds?
        
             | Ensorceled wrote:
             | My first job out of university, I was promoted to manager
             | in my mid 20s. One of the senior engineers reporting to me
             | had kids older than me.
             | 
             | Now, they were PAID a lot more than me ...
             | 
             | The first thing they taught me was that it wasn't my job to
             | do the work, because it didn't matter how smart I was, I
             | didn't have almost 30 years experience.
        
             | SkyPuncher wrote:
             | Not as extreme, but not far off. I believe I'm the youngest
             | person on the team I manage.
             | 
             | I've spent a lot of time in startups - including way too
             | many hours in my 20's working on side-hustles (wife was in
             | med school, so it was kind of my thing to do). I've ended
             | up in a situation where my technical skills are strong (but
             | not the best on my team), but my business/startup knowledge
             | is much better so I can help to ensure everyone is working
             | towards the most impactful/valuable outcomes.
        
             | superfrank wrote:
             | I worked at a start up where the founders were 25 & 26 and
             | most of their first 25 employees were their friends who
             | were similar aged. In less than two years, there were
             | almost 100 employees, plenty of which were in the 50s.
             | 
             | The company's last valuation has it worth over a billion
             | dollars now and they have a few hundred employees. A good
             | chunk of the C suite and VPs are still those same early
             | employees who are now in their late 20s and early 30s. Some
             | are managing former FAANG employees in their 50s.
        
             | mbrameld wrote:
             | It's not unusual in the US military for a lieutenant or
             | captain in their early 20s to manage many senior non-
             | commissioned officers in their late 40s.
        
               | dfsegoat wrote:
               | No mil. experience myself, but I'd say that while the
               | officers may technically 'manage' the NCO's, that with
               | few exceptions it is the NCO's that actually get things
               | done.
        
               | throwawayboise wrote:
               | Yeah the officers all move on relatively quickly; the
               | NCOs may be on the same ship or class of ship their
               | entire career.
        
             | perfect_wave wrote:
             | I'm a 25 year old managing a global team of 8 people. I'm
             | self-conscious about my age both in my 1:1s with my reports
             | and when talking with customers. That being said, it seems
             | like things are going well. My team is doing great metrics
             | and achievements wise and the company we work for tripled
             | in size in under a year.
        
               | foobarian wrote:
               | You know what I usually tell my managers. "Thank you for
               | your service" :-)
        
             | asow92 wrote:
             | A few years ago, I was a "team lead" at the age of 27
             | managing a team that included one developer over 50 at a
             | big TV network company.
             | 
             | We're both at different companies nowadays, but I've been
             | trying to get him started at my current company's team
             | (which I am senior on, but not a lead) for a while now and
             | he's considering it!
        
             | ipaddr wrote:
             | Many organizations and it is a normal thing.
        
             | ttymck wrote:
             | Could a 30 year old manage a 60 year old? Certainly a 35
             | year old could manage a 57 year old?
        
               | bayindirh wrote:
               | If the 60 year old is wise and humble and 30 year old is
               | open minded and not smug, it'd create a hell of a
               | learning environment.
        
               | FpUser wrote:
               | Definitely. Just do not micromanage and drag to endless
               | useless meetings.
        
             | scrumbledober wrote:
             | I have met several engineers that were very much senior to
             | their managers but did not want to make the shift from IC
             | to management.
        
             | Hermitian909 wrote:
             | I've known people who submitted working patches to the
             | Linux kernel at 13, which I'd say is a reasonable start for
             | "doing this". A 30 year old managing a 43 year old would
             | not be strange at all.
        
               | dhosek wrote:
               | Exactly, I started programming in AppleSoft BASIC when I
               | was 11, picked up 6502 Assembly and Pascal before high
               | school and added C, Rexx. 370 assembler and FORTRAN
               | before I started college. I was 28 the first time I had a
               | manager younger than me. I think the last time I had a
               | manager older than me was when I had a job where my
               | direct report was to the CTO.
        
             | galdosdi wrote:
             | Anecdote, but this was the approximate case on the team I
             | worked on at Google (Manager in his mid 30s, team mostly in
             | their 20s with one in his 50s). It happens. Actually, it
             | was nice to see, as some evidence of non-ageism.
             | 
             | I hope to no longer need to work by the time I'm 50, but
             | nobody knows what the future will bring, so I'd certainly
             | like to have the option just in case!
        
             | smcleod wrote:
             | In a previous job I was team lead of a team that had a
             | person in they're 40s and one in their 50s, I started as
             | lead as a 23 year old and moved on when I was 30. There are
             | many things I'd do differently now, but it was an effective
             | and impactful mostly high functioning team. It does happen.
        
             | imoverclocked wrote:
             | A lot. Technical managers need not be experienced technical
             | talents who have made a potentially incompatible shift to
             | management.
        
               | icedchai wrote:
               | It is _better_ if the managers of technical people are
               | technical themselves. Otherwise you wind up with the
               | Dilbert  "pointy-haired-boss" syndrome. The non-technical
               | manager is extremely easy to bullshit, so it's better for
               | the company in almost all ways.
        
               | ipaddr wrote:
               | An experienced manager is not easy to bullshit
               | regardless. Sometimes a non-technical manager is better
               | for many reasons. Having business domain experience can
               | be just as valuable
        
           | Ensorceled wrote:
           | > Welcome to the real world, if your work is interesting, the
           | clock might not turn on when I'm having fun.
           | 
           | Ha! Yeah, I worked on a really cool project for a charity a
           | few years ago: "How many hours is this going to cost us this
           | week, you were working like a warrior?" "35"
        
           | amelius wrote:
           | > If your work is bullshot, I bill tighter than my lawyer
           | 
           | Lawyers must hate their work.
        
             | Taylor_OD wrote:
             | I believe it has one of the lowest job satisfaction of any
             | white collar jobs. I've wondered that is folks didnt have
             | the massive student loans to pay off early on if they would
             | stick with it.
        
               | BurningFrog wrote:
               | Many law firms are incredibly well paid sweatshops.
        
             | skissane wrote:
             | > Lawyers must hate their work.
             | 
             | A friend of mine is a criminal defence lawyer. I get the
             | impression he really enjoys his work - he gets to meet a
             | lot of people he never normally would (bikie gang members,
             | terrorists, murderers, drug dealers, drug addicts, etc) -
             | and he feels safe in doing so (he tells me that defendants
             | trying to harm their own lawyers is quite rare, rare enough
             | that he isn't worried about it).
             | 
             | Once, at a work function (previous employer), I met one of
             | the lawyers from the contracts department. He was telling
             | me how he used to live in a rural area doing agricultural
             | real estate transactions, now he had moved to the big city
             | to do in-house contracts review for a multinational
             | software company. He was a top performer (indeed, this was
             | a function to reward people who'd been nominated as "top
             | performers" by their management)-but he didn't give me the
             | impression he really loved what he did, more that he was
             | just doing it to support his family.
        
         | zachlloyd wrote:
         | i see the point here.
         | 
         | i do think giving space for hard work is important. i still
         | more often see the opposite problem of too much silo'd work
         | leads to wasted effort, but for some really hard problems,
         | having a bunch of space to think them through is beneficial.
        
         | ravenstine wrote:
         | Yes, I think this is undoubtedly true. I didn't really learn
         | until I advanced my career that, in some respects, being a
         | junior or mid-level developer is actually _better_. Being a
         | senior can be a slog, and while I got paid little in earlier
         | positions, I actually got to do more interesting things, screw
         | up more, and build things from scratch.
         | 
         | The other thing that can encourage doing too much work before
         | looping in others is the culture of the team. You are lucky if
         | you can amass a team of people who all have the same attitude
         | of talking to each other frequently and handling a certain
         | level of interruption. I've worked on such teams and miss them.
         | Although pretty much everyone at any company you work at will
         | say "ask questions, don't hesitate, blah blah blah", there are
         | teams where people go _weeks_ not talking or sharing work, and
         | everyone is always too busy to get interrupted. If work gets
         | assigned in large chunks, as can happen for seniors in
         | particular, it can also just not make sense to loop in someone
         | temporarily if more time needs to be taken for the other person
         | to catch up.
        
         | rory wrote:
         | A good point, but the reason I have (and fight) this problem is
         | much simpler:
         | 
         | I like writing code. I dislike talking to people.
        
         | 6gvONxR4sf7o wrote:
         | > It also offers chance to produce memorable work as nobody
         | remembers the set of 3 point tasks you completed ten sprints
         | ago.
         | 
         | This is one of the more toxic ones. To get past senior, you
         | often need to be seen to do Big Memorable Things. It sometimes
         | leads to perverse incentives.
        
           | skrtskrt wrote:
           | To me moving beyond senior means you enable the entire team
           | to contribute together accomplish Big Memorable Things.
           | 
           | This can mean a ton of things, which cannot all be served by
           | a single senior+ engineer:
           | 
           | * mentorship
           | 
           | * seeking out, establishing, and evangelizing best practices,
           | and not just coding best practices: architecture,
           | documentation, testing, ci/cd etc
           | 
           | * high-level architecture knowledge and experience
           | 
           | * evaluating technology choices: tooling, databases,
           | orchestration platforms, etc etc
           | 
           | * assisting management and product with scoping and
           | prioritizing work
           | 
           | * the ability to put your head down and crank out a solution
           | to something in code simply because it needs done and you can
           | do it better and/or faster than others
           | 
           | * laying the framework of a greenfield project, maybe
           | sketching out the codebase or POC for juniors to take and run
           | with
           | 
           | * ...and so on and so forth.
           | 
           | A single person may be able to contribute all these things to
           | a team over a time frame of multiple years, but in a 3 or 6
           | month time frame, most mortal engineers could only contribute
           | two or three.
        
           | belval wrote:
           | I mean it's not that toxic, if you are a good worker bee your
           | manager will usually notice and be happy with your
           | performance. Then from time-to-time you branch off to do
           | something more high-risk to add to your promo doc.
           | 
           | I think a lot of people have weaker communication skills than
           | execution skills. So they could loop in everyone early on,
           | but their idea might get killed off because they failed to
           | justify it properly. If instead they leverage their execution
           | skills and make an MVP that will speak for itself, then they
           | bypass that issue.
        
             | 6gvONxR4sf7o wrote:
             | Maybe toxic is the wrong word. Perverse maybe. But I don't
             | think that being a good worker bee often gets people past
             | the senior level, at least from what I've seen. But also
             | getting past senior is rarer, so maybe what I've seen isn't
             | representative.
        
             | FpUser wrote:
             | >"if you are a good worker bee your manager will usually
             | notice and be happy with your performance"
             | 
             | And other than some bonus never promote you. If you have
             | capability to be anything above that "worker bee" say / ask
             | exactly what you want. If not look for another job. While
             | this SCRUM / Agile bullshit is wide spread and even works
             | in some specific circumstances there are enough companies
             | that are not hung up on moving pins on dashboard and where
             | one can really grow.
             | 
             | Work for yourself. Work with the manager, not for manager.
        
               | belval wrote:
               | > Then from time-to-time you branch off to do something
               | more high-risk to add to your promo doc.
               | 
               | I agree, that's exactly what I wrote.
        
           | sodapopcan wrote:
           | Exeactly. There is too much emphasis put on rewarding those
           | who make big, disruptive change and large, solo wins. Someone
           | making a lot of little wins are just as valuable yet usually
           | don't any great accolates for it. Not to mention, putting one
           | person on a large-ish project is a great way to create silos.
        
           | closeparen wrote:
           | I think it's management and their "agile" philosophy that's
           | toxic here, intentionally depriving engineers of any sense of
           | ownership, autonomy, or vision-fulfillment over their work by
           | constantly bouncing them around across small disjoint tasks.
           | 
           | I am incredibly fortunate to work in a place that values
           | ownership, both explicitly and in practice. Given how
           | widespread the opposing value system is, I'm afraid to ever
           | leave.
        
       | pojzon wrote:
       | I've faced worse issue. So you are thinking about problem
       | solution, you created a design and you ask ppl for their
       | opinionated view about the problem and your solution.
       | 
       | Issue is - they cannot even give you a good feedback because they
       | are not that advanced.
       | 
       | The issue of being a great engineer is that there are not many
       | great engineers you can have a constructive discussion with.
       | 
       | You are sometimes even "expected" to deliver solution alone,
       | because there is noone who even grasps the concept.
       | 
       | One could say its simply an incorrect team composition in this
       | case but well.. what can you do about it when you are also asked
       | to in the same time train ppl who clearly dont have the capacity
       | to match your level - and better - they are supposed to reach
       | that level soonTM.
        
         | reureu wrote:
         | Amen to this. In a similar vein, in a heavily resourced
         | constrained environment, the rest of the team may be really
         | competent but be struggling to meet their own deadlines so just
         | don't have the mental bandwidth or time to provide any
         | feedback.
         | 
         | I've had this issue at a few jobs in the past, and I know I've
         | come off as the lone developer who ventured too far... but at
         | every step along the way I stopped, sent in a PR, scheduled a
         | meeting, etc but got virtually no engagement. And I was still
         | getting pressure from stakeholders to deliver, so had to keep
         | moving :-/
         | 
         | I think OP brings up an interesting problem, but I don't think
         | the solution is often as easy as sending in earlier PRs. It
         | might actually be a structural or cultural problem in the
         | organization.
        
       | cercatrova wrote:
       | The mistake is "doing too much work on their own before looping
       | in others."
       | 
       | Can we edit the title to remove these kinds of clickbaity titles?
        
         | dang wrote:
         | Sure.
        
       | [deleted]
        
       | Ozzie_osman wrote:
       | We have a saying on our team, "don't go down the rabbit hole
       | alone".
       | 
       | Honestly I think the reasons mentioned in the article for why
       | this happens are valid, but more frequently, people are a little
       | insecure about their work or a little too much of a
       | perfectionist, and that creates slightly enough friction to deter
       | them from sharing progress or asking for help early on.
        
       | commandlinefan wrote:
       | This whole post strikes me as somebody making up a world as he
       | believes it ought to be and then suggesting advice for navigating
       | _that_ world, rather than the real one. For example:
       | 
       | > Always encourage engineers to show their work as quickly as
       | possible
       | 
       | Yep, that sounds like _great_ advice. On  "paper", anyway. I
       | tried to do that when I first started out, too. What I found was
       | that communicating "this is just an early draft, it'll be better
       | when I'm finished" was well-near impossible, no matter how hard I
       | tried.
        
       | adverbly wrote:
       | They missed one reason why it can happen: Because doing things
       | "the right way" is too slow, and the engineer is trying to skirt
       | around process because the company moves way too slowly. Not out
       | of malice or negligence, but out of a fear of the megacorp
       | killing agility. I've seen entire teams at megacorps or
       | governments try to keep others in the dark with projects that
       | would be crushed under strict corporate rules.
        
         | gmfawcett wrote:
         | It doesn't have to be a megacorp. Looping new people into a
         | deep problem takes time, and can kill momentum if not done in a
         | strategic way. Your personal time on any problem is finite, and
         | you can exhaust that time-budget on bringing the wrong people
         | up to speed. This is doubly true when the other person isn't on
         | your team or in your organization: e.g., bringing in vendor
         | support. (Maybe your experience is different; in mine, bringing
         | in remote experts doesn't guarantee a faster resolution.)
        
       | Veuxdo wrote:
       | Sometimes you have to dive into a problem, experiment, try things
       | out.
       | 
       | There is such a thing as premature collaboration.
       | 
       | If you want to be truly great at something, you need to practice
       | it consistently by yourself.
        
         | pojzon wrote:
         | Indeed, question made by managers is:
         | 
         | "Can you train in spare time?"
         | 
         | "While working on your own projects"
        
       | Trasmatta wrote:
       | I'm good at working on a team and looping in others. I also find
       | it to be one of the most exhausting parts of software
       | development. It's so difficult to constantly need to get feedback
       | and buy-in from other people, and takes away a lot of the
       | creativity and joy in programming (for me).
       | 
       | Which isn't to say you shouldn't do it, just that it's one of the
       | things that makes me dislike working on a team. I actually think
       | this may be one of the factors in burnout for a lot of
       | developers. Writing code as a team is almost like writing a novel
       | with a few dozen other people, all of which have differing ideas
       | on how the book should be written, or even what it should be
       | about. It's hard to feel the joy in creating something when
       | you're only a small cog in the development machine, and every
       | decision needs a dozen voices of input.
       | 
       | It's disempowering to feel like you're never able to make a
       | decision yourself, despite supposedly being hired for your
       | expertise in the field.
       | 
       | > Always encourage engineers to show their work as quickly as
       | possible - an engineer on a project should never go more than a
       | week without showing something, and usually it should be more
       | like a day.
       | 
       | "usually it should be more like a day" is bad advice in my
       | opinion, and a likely source of micro management. Let
       | professionals do their work.
        
         | Panoramix wrote:
         | I wholeheartedly agree, if you need daily feedback you're a bad
         | manager (unless you're in some exotic situation like a rocket
         | launch or something).
         | 
         | This issue largely disappears if your engineers are given the
         | proper context, background and system overview.
         | 
         | I'm not advocating everybody should take their project and run
         | with it for weeks on end, but daily updates are ridiculous.
        
           | TameAntelope wrote:
           | I'd actually flip that, and say if you can't give daily
           | feedback you're a "bad" developer (I'd probably use
           | "inexperienced" or "new" rather than "bad", because it's a
           | hard mindset shift and it takes time).
           | 
           | In fact, not only should you be able to give daily updates,
           | you should be able to ship functionality on the daily. From
           | first line of code into production and in front of customers
           | should only ever take about 2 to 16 hours of work.
           | 
           | If you can't work at that cadence, you're probably not being
           | as effective as you could be, as a developer. A "good"
           | manager enables you to work like this.
        
             | beefield wrote:
             | Thanks for this comment. It pretty much confirms my hunch
             | that I would not be happy in a "developer" role. I have
             | done quite a lot work that requires writing code. But often
             | it has been projects with literally months before there has
             | been anything that anyone might call functionality.
        
               | mh- wrote:
               | Please don't over-index on this comment. It's pretty out
               | of touch with how the majority of the field works.
        
             | dogleash wrote:
             | I used to work at an R&D company. While that cadence is
             | possible in a website mill, it's a laughable blanket
             | statement.
        
               | gffrd wrote:
               | Just wanted to say thank you for "website mill" ... I'm
               | reminded of this stark difference when talking with a
               | friend who builds ultrasonic hardware.
        
             | [deleted]
        
             | Trasmatta wrote:
             | I strongly disagree with this. This is an approach to
             | development that encourages an extremely limited and short
             | term view on development that leads to low quality software
             | and unhappy developers. It's also only remotely possible
             | with a certain type of software.
        
             | yibg wrote:
             | For larger pieces of work, some times it takes me more than
             | a day to just figure out what's where and where I can even
             | get started. I guess I can still give updates daily, but
             | it'll just be "still investigating".
             | 
             | Hell, I've fixed 1 liner bugs that have taken me a week to
             | figure out.
        
         | mattferderer wrote:
         | As much as I love the feeling of writing something clever or
         | that feels really well done, I hate the feeling of realizing
         | it's the wrong thing even more.
        
           | Trasmatta wrote:
           | Agreed, and that's why I mentioned I think you shouldn't just
           | silo yourself. That doesn't seem to work either. I don't
           | really have a good answer or alternative, more just pointing
           | out how the dynamics of team based software development seem
           | to be optimized towards burning out programmers. I don't know
           | how to fix it, but it seems to be a problem.
           | 
           | A first step is probably treating your developers skilled
           | specialists (hopefully you've hired a good team, of course),
           | and not just code monkeys who have to show their manager a
           | progress report every single day.
        
             | peakaboo wrote:
             | You do know how to fix it - you don't loop in others until
             | you want to.
             | 
             | The problem is our industry, forcing developers to exhaust
             | their energy on pair programming in open offices. May as
             | well be in a daycare center with children all around.
        
               | Trasmatta wrote:
               | Ugh, my worst development job ever was one that had
               | mandatory full time pair programming. Full time pairing
               | is one of the worst ideas ever conceived in the software
               | world.
        
               | onemoresoop wrote:
               | Pair programming should be optional and for whoever wants
               | to get team members (especially juniors) up to speed and
               | on the same page. It could be very productive but like
               | all methods/tools that are shoved down everyone's throat
               | and forced to apply them, I could see them being a
               | disaster.
        
               | Trasmatta wrote:
               | I generally enjoy pair programming when utilized
               | occasionally and as needed, but mandatory pairing is just
               | horrible.
        
               | onemoresoop wrote:
               | Each tool has its use case. Forced use results in misuse.
        
               | dhosek wrote:
               | I actually found it quite helpful, not just for getting
               | up to speed. After moving to another division of that
               | company that didn't employ full-time pair programming, I
               | saw code of noticeably lower quality being produced. That
               | said, it was emotionally exhausting for me to do full-
               | time pairing and I'm not sure I'd go back to it.
        
           | [deleted]
        
         | daenz wrote:
         | The trick is to make the "right" decision yourself while
         | helping people feel like they were heard and had a chance to
         | give their input.
         | 
         | From my experience, people don't actually want to control the
         | output of everything, they just want the opportunity to be
         | heard. What you do with it from there doesn't matter as much,
         | so long as the desired outcome is "correct". If the desired
         | outcome is not correct however... then you have to justify all
         | of the input that you didn't act on.
        
           | Trasmatta wrote:
           | The tricky part for me is that sometimes I did actually need
           | that input from others on the team. Sometimes it's all just
           | bikeshedding and a waste of time, but sometimes it does help
           | me from going down a rabbit hole that might have wasted weeks
           | of development.
           | 
           | But regardless, I find that whole process exhausting and
           | disempowering, even if there is sometimes a benefit from it.
        
         | peakaboo wrote:
         | Completely agree with this, and this is why I simply don't loop
         | in others.
         | 
         | I wrote a program the way I think it should be. Clean code,
         | super easy to understand, super low complexity. Anyone can
         | understand what it does.
         | 
         | Thats fun for me, when the code is very simple, reads like
         | English and there are no complex functions.
         | 
         | I don't do real software engineering however (just business
         | intelligence and python programs to extract and load data). But
         | when it comes to looping in colleagues, I avoid it for the same
         | reasons as above.
         | 
         | Its exhausting.
        
         | drawkbox wrote:
         | > Writing code as a team is almost like writing a novel with a
         | few dozen other people, all of which have differing ideas on
         | how the book should be written, or even what it should be
         | about.
         | 
         | I use this exact description when discussing balancing creative
         | side of the value creation project processes, design and
         | development over the value extraction side of products. Small
         | empowered teams with an almost startup mindset is key, but even
         | more is time to play to find solutions that can make products
         | that are more like friends than enemies to people.
         | 
         | Engineering/development, creative and product
         | design/development are creative fields, a value creation action
         | and activity.
         | 
         | Business, finance, marketing do not see many parts of this as a
         | creative action but a production line, a value extraction
         | action and activity.
         | 
         | A large problem is the misunderstanding that new projects are
         | value creation not just value extraction, and rely on
         | creativity at inception. Once they are established they can be
         | more patterned and predictable and ramped up, but initially the
         | creative phase is the key to making good products. Smaller
         | teams, more empowering of the people that can create products
         | that get the early points right. Taking long enough in the
         | "open" mode before the "closed" mode is key, essentially
         | prototyping and play is needed, but rarely available in the
         | modern processes and project management systems where
         | engineering is simply "production". There is a pre-production
         | and post-production that is usually left out.
         | 
         | For instance in game development, pushing through a project
         | process before the main game mechanic is "fun" is a problem.
         | You can't get creative on a forced schedule just as you
         | couldn't write a book that way or come up with a novel new
         | concept in some software app that should be a friend to users.
         | The prototype of the project or product must have some time to
         | simmer and iterate on. The first thing managers do is cut that
         | time and sometimes throw too many people at it resulting in
         | Mythical Man Month level mistakes leading to too many cooks.
         | When a prototype or early product has value mostly figured out,
         | then it can go into a more robust process to create variations
         | or iterations. The initial value creation will always be wildly
         | hard to estimate.
         | 
         | Good examples of this in software are programming languages,
         | usually it is one person for a long time then others join in to
         | ramp up when the vibe of the language is set. Same with books,
         | movies, games, anything really. You can't have 10 people
         | drawing the same illustration or writing the same book, the
         | parallel part can be multiple people doing their own to see
         | which is best, but you can't have them all in on one creative
         | project without it being confused.
         | 
         | I have seen companies turn into faction based wars when varying
         | groups don't clearly respect the value creation and value
         | extraction balance, the value creation MUST come before the
         | value extraction. The open mode before the closed mode.
         | 
         | A great talk by John Cleese on the "open" and "closed" mode [1]
         | helps describe this, which I recommend and hope everyone I work
         | with watches. Value creators need time and creativity to create
         | value both in the "open" mode to explore/prototype/build and
         | the "closed" mode when things are decided to ship. The value
         | extractors always want people in the controlled "closed" mode
         | only, the "open" mode is non quantifiable and seen as almost an
         | enemy to the value extractors but is key to creating products
         | that are so good they are like friends to value creators and
         | the people using the products.
         | 
         | The value extractors are who Fred Brooks talked about in the
         | Mythical Man month [2], they think things are a factory with
         | already figured out steps, when you are in a field that uses
         | originality, creativity, the mind over the physical, it isn't
         | like a factory or supply line. Every single project manager
         | needs to know about the Mythical Man month.
         | 
         | Here's a great point by Steve Jobs about product stagnation and
         | the managers/business side [3] and how they can run amok if not
         | controlled to allow value creation to continue, and how
         | monopolies or problems that arise when only the
         | business/managers are in charge. This point is more about
         | larger companies than new projects but the same forces that
         | stop innovation at large companies also kill it in any sized
         | companies when there is no value creation / value extraction
         | balance.
         | 
         | > _It turns out the same thing can happen in technology
         | companies that get monopolies, like IBM or Xerox. If you were a
         | product person at IBM or Xerox, so you make a better copier or
         | computer. So what? When you have monopoly market share, the
         | company 's not any more successful._
         | 
         | > _So the people that can make the company more successful are
         | sales and marketing people, and they end up running the
         | companies. And the product people get driven out of the
         | decision making forums, and the companies forget what it means
         | to make great products. The product sensibility and the product
         | genius that brought them to that monopolistic position gets
         | rotted out by people running these companies that have no
         | conception of a good product versus a bad product._
         | 
         | > _They have no conception of the craftsmanship that 's
         | required to take a good idea and turn it into a good product.
         | And they really have no feeling in their hearts, usually, about
         | wanting to really help the customers._
         | 
         | Modern project management processes promote shallow change over
         | deeper dives. They create a risk profile for anyone looking to
         | bring new innovations that might be hard to estimate because it
         | will be a perceptual hit. These rigid tightly wound processes
         | are horrible for creativity. Agile itself has been captured
         | with tightly wound controlling mechanisms like the daily
         | standup, and so much weight around trying new things as well as
         | perceptual hits for that. Anyone truly trying to make new value
         | will be seen as an enemy to these systems. Agile was created to
         | give product people more margin to build, but it has been
         | coopted into being used to control creativity which cannot be
         | controlled, it simply disappears when there is no open mode and
         | only a closed mode or nothing but value extraction.
         | 
         | All of this is spelled out in "How Software Companies Die" as
         | well [4]. I wonder when if these realities will make it into
         | the business education curriculum.
         | 
         | [1] https://www.youtube.com/watch?v=Pb5oIIPO62g
         | 
         | [2] https://en.wikipedia.org/wiki/The_Mythical_Man-Month
         | 
         | [3] https://www.businessinsider.com/steve-jobs-on-why-
         | innovation...
         | 
         | [4] https://news.ycombinator.com/item?id=1866486
        
           | Trasmatta wrote:
           | I don't have a lot to add except to say I loved this reply. I
           | think a lot of people might miss it since it's down in the
           | replies, maybe you could expand on it, and make it a blog
           | post at some point?
        
             | drawkbox wrote:
             | Thanks, your post also resonated when you mentioned exactly
             | the way I see it. I will be writing up more on this as it
             | is a theme of mine and have quite a bit here at HN, and
             | other areas where value creators are.
             | 
             | Good news is there are lots of us like it, the problem is
             | since the value creators rarely control the funding and
             | sometimes lose the power to implement these the right way
             | before internal faction wars start. However at all good
             | product and all good companies, you'll see the respect of
             | value creation and the open mode. One day maybe
             | business/finance will see it with the same value.
             | 
             | A couple of points as well, there is an internal and
             | external view of a product. The external view is really all
             | that matters, the market perception. The internal
             | perceptions and processes if they are made too tight or the
             | main focus, the external product suffers. This is one
             | reason I think remote companies that are smaller, or having
             | small teams, do better. They focus on their external view
             | over the internal. Most remote work is virtual just like
             | most communication today and especially the communication
             | with the people that use products. The external view needs
             | to be the main focus as well as simplicity, but also the
             | "friend" aspect of a product. Using a product should be a
             | simple joy, a friendly part of your day. External focused
             | setups work the best to achieve that.
        
         | n0w wrote:
         | > _Writing code as a team is almost like writing a novel with a
         | few dozen other people, all of which have differing ideas on
         | how the book should be written, or even what it should be
         | about. It 's hard to feel the joy in creating something when
         | you're only a small cog in the development machine, and every
         | decision needs a dozen voices of input._
         | 
         | This resonates with me. I think we do our best work when we
         | have the autonomy to apply our expertise.
         | 
         | But at the end of the day, you're not the only one writing that
         | novel. If you have an idea of where the plot is going but your
         | teammates think it's heading somewhere else, it's going to be
         | very problematic.
         | 
         | The other problem is that you _will_ make mistakes. Some could
         | be avoided by leveraging the experience of your teammates. You
         | also won't always strictly have the best ideas. Brainstorming
         | as a group can be a lot more effective than sitting alone for a
         | long time thinking hard about a problem (but also sometimes
         | hard problems need a lot of individual thought).
         | 
         | I suppose my point is that I'm not sure where the happy medium
         | is? I've been on both sides of the "engineer working too long
         | alone before sharing" problem and I think it sucks.
         | 
         | How do we enable engineers to do their best work but also allow
         | our teams to be successful?
        
         | rurp wrote:
         | Due to some turnover I ended up working mostly independently
         | for about a year at a previous job. Nobody cared one bit about
         | the code I wrote, just the end result. Overall it was great! I
         | was surprised at how productive I was in that time. I'm not a
         | partiularly amazing developer, but I managed to ship a ton of
         | work that held up quite well.
         | 
         | Obviously there are limits to this approach and it wouldn't
         | work well for solving really difficult problems, but really,
         | 99% of day-to-day development work isn't that special. A
         | motivated and conscientious developer with average skills can
         | get an awful lot done with minimal distractions.
        
       ___________________________________________________________________