(C) PLOS One This story was originally published by PLOS One and is unaltered. . . . . . . . . . . Differentiating between urban flood risk as a unitary problem and as a strand in a braided problem set: Implications for administrative coordination [1] ['Sarah Michaels', 'Department Of Political Science', 'Faculty Fellow', 'Public Policy Center', 'University Of Nebraska-Lincoln', 'Lincoln', 'Ne', 'United States Of America'] Date: 2023-03 Abstract Flood protection is a leading priority for urban water sustainability. Making cities more resilient to flooding has become urgent as the climate changes and as cities increasingly become the loci of human population and resources. Reducing the risk of future flooding in cities often necessitates different jurisdictions working together. They may do so because they confront a shared problem. This was the case in the City of Lincoln, Nebraska, USA, when partnering agencies shared a single focus on reducing flood risk from Beal Slough to the Nebraska State Penitentiary. In contrast, entities may band together to confront braided problems, intertwined problems that cannot be resolved independently. The Antelope Valley Project, also in Lincoln, Nebraska, USA, combined addressing three problems, for which individual solutions had not been achieved: reducing flood risk from Antelope Creek, improving road transportation safety and capacity, and revitalizing neighborhoods with deteriorating physical structures. Such a scenario is becoming more frequent as cities increasingly face multiple demands on the same location. As this comparative case study demonstrates, there are implications for administrative coordination for whether flood risk reduction can be achieved as a sole focus of a project and when it cannot. The Antelope Valley Project necessitated an innovative management structure and governance process that the Beal Slough Project did not. In the Antelope Valley Project three different, stand-alone entities operating in dissimilar, substantive domains redirected their independent policies to harmonize their problem solving. Collaborative learning among policy actors in the Antelope Valley was more extensive and across policy domains than was required in the Beal Slough Project. Yet, both projects were triggered by policy-oriented learning from the remapping of their respective subwatersheds. The study contributes to understanding interdependency among policy problems and to reducing urban flood risk through administrative coordination. Citation: Michaels S (2023) Differentiating between urban flood risk as a unitary problem and as a strand in a braided problem set: Implications for administrative coordination. PLOS Water 2(3): e0000090. https://doi.org/10.1371/journal.pwat.0000090 Editor: Majid Shafiee-Jood, University of Virginia, UNITED STATES Received: October 22, 2022; Accepted: January 9, 2023; Published: March 24, 2023 Copyright: © 2023 Sarah Michaels. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited. Data Availability: All data are in the manuscript. Funding: The authors received no specific funding for this work. Competing interests: The authors have declared that no competing interests exist. Introduction Climate change and urbanization are anticipated to increase catastrophic flooding worldwide [1]. Floods are the most frequent natural hazard around the world [1,2] with the widest geographical distribution [2]. In the United States, floods occur throughout the country and cause more losses than any other natural disaster. Most of the federally declared disasters list flooding as a leading or consequent source of damage [3]. Flooding can be disastrous on its own and can make other calamities worse [4]. U.S. federal assistance is not available for over half the floods that cause damage in the country [3]. In addition, many inland cities are experiencing and are anticipated to experience effects of climate change, including more frequent and intense storms in which there is high rainfall amounts over shorter time durations [3]. There is the long-recognized threat of fluvial flooding when the capacity of a river channel is exceeded. There is mounting concern about pluvial flooding, when drainage capacity, whether engineered or natural, is exceeded [5]. As global climate changes and as cities increasingly become the loci of human population and resources, making cities more resilient to flooding becomes more pressing [5,6] and is key to achieving urban water sustainability [7]. To adapt to increased flooding risk requires innovative strategies to make the built environment more resilient [8]. One means to do so is through effective and appropriate administrative coordination for developing urban flood management infrastructure. Administrative coordination occurs through reforms improving how organizations interact and cooperate with each other to develop and execute policies [9]. How entities interact and what they achieve jointly varies as a function of the form of their collaborative endeavor [10]. Therefore, there is no one form of administrative coordination that is appropriate for all urban flood mitigation projects given how widely they vary in scope, scale, and intent [8,11]. An underexplored consideration is whether an urban flood mitigation project can be undertaken by itself or must be executed in tandem with other urban infrastructure projects. In part, this is because of a well-developed trend in urban flood risk management scholarship to focus on reducing flood risk in cities as a self-contained concern [12–16]. One of the core reasons for entities to cooperate is to shape the set of conditions causing, exacerbating, or allowing a problem to continue [17]. Sometimes a set of conditions is sufficiently disconnected from the wider context to produce a unitary, shared problem. At other times it is not, producing a set of braided problems. Explicit [18] and implicit [19] in the collaborative governance literature is that entities join forces to address shared problems. Yet, entities may work together because their problems are sufficiently intertwined with other problems beyond their authorities they can only resolve them in concert with resolving other problems. While the nature of the problem set bears on how entities coalesce and what they accomplish, the distinction between a shared set of problems and a braided set of problems has scarcely been acknowledged, let alone probed in the scholarship related to urban flood risk reduction. Consequently, this paper asks two, paired questions. (1) What are the circumstances in which urban flood risk reduction can be pursued and realized in isolation? (2) What are the circumstances in which policy actors responsible for reducing urban flood risk must engage with related issues that may appear to fall outside their purview? This comparative case study of two urban flood mitigation projects in Lincoln, Nebraska, USA identifies how entities work together to address unitary, shared urban flood mitigation problems and urban flood mitigation problems interwoven with other urban management problems. In doing so, it contributes to understanding a key characteristic of policy problems, interdependency among policy problems [20]. The notion of braided problems in which a problem may be defined independently but not resolved independently is the basis for a simple typology that offers guidance in deciding which administrative coordination strategy to pursue. The next section considers interdependency as a policy problem characteristic, as this is fundamental to understanding the utility of distinguishing between a shared problem and a set of braided problems. A description of the case study approach follows, before the two case studies are presented. The case studies are then used to understand how to characterize collaborative elements of administrative coordination, how learning serves administrative coordination and how mapping provides a means of policy-oriented learning. The concluding discussion highlights the wider implications of distinguishing between a shared problem and a set of braided problems. Interdependency as a policy problem characteristic A problem is the discrepancy between an intolerable and a tolerable situation. A policy is a commitment to a course of action by an entity or entities with the authority to impose a course of action within one or more jurisdictions. Interdependency is an important characteristic of policy problems [20] since problems are commonly interlinked within a system [21]. Brown [22], Ackoff [23] and Peters [24] observe that policy problems do not exist independently since they act with others as components of a structure of problems. Ackoff’s depiction of messes provides an important historical touchstone in thinking about interconnected problems [20,24,25]. Ackoff [23] (21) coined the term a mess to describe a system of problems, “…a system of external conditions that produces dissatisfaction.” Ackoff [26] (99) went on to explain that messes are “dynamic situations that consist of complex systems of changing problems that interact with each other”. Interdependence increases the complexity of resolving problems by expanding how many organizations need to be involved [27]. The more interdependent problems are the more difficult they are for politically created coalitions to resolve. Managing interdependent problems creates a need, at a minimum, for coordination and potentially for integrating policies and organizations [28]. The greater the interdependency among problems, the more likely organizations will have to develop new routines to address them [29]. The extent of interdependence among policy problems can be understood by considering if a problem can be defined independently or must be defined in conjunction with other problems and whether or not it can be resolved on its own or must be resolved in conjunction with other problems. See Table 1. A stand-alone policy problem can be defined and resolved independently. The term, braided set of problems, captures how under certain, specific circumstances, there are interdependent policy problems that, on one hand, can be defined independently and, on the other hand, cannot be resolved independently. While it is possible to articulate separate policy problems in a braided problem set, each of them can only be resolved as part of a package where all of them are resolved. This contrasts with Ackoff’s [23] notion of messes in which interdependent policy problems can neither be defined nor resolved separately [24]. PPT PowerPoint slide PNG larger image TIFF original image Download: Table 1. Distinguishing among policy problems based on whether or not their definition and resolution are independent or interdependent of other policy problems. https://doi.org/10.1371/journal.pwat.0000090.t001 In policy making, coordination has been regarded as different policy actors working together to achieve a common end [30,31]. Consequently, the distinction between working on a shared, stand-alone problem and working on a set of braided problems, arguably, has not been highlighted to the extent it warrants. The assumption of a shared, single problem may have resulted from the lack of theoretical grounding for policy problem classification schemes [24] or theory that placed an emphasis on other dimensions of explanation (for example Stone [32]). Regardless, the assumption of a shared, single problem has been widespread [24,32–41]. For example, Gray [18] (5) notes “parties who see different aspects of a problem can constructively explore their differences and search for solutions that go beyond their own limited vision of what is possible”. Case study approach A pilot case study approach was employed to enable an in-depth multi-faceted investigation of phenomena within real world contexts in which they occur, thus providing a rich appreciation of complex situations, historical specificity [42,43] and policy subtleties [44]. A case study approach enabled producing tangible context-dependent knowledge [45]. The case studies were purposely selected to acquire salient information that could not have been attained in such richness otherwise [46]. The case studies investigated constitute best case scenarios for addressing problems through interlocal cooperation. They address what Rittel and Webber [47] would describe as tame rather than wicked problems and what Dunn [20] would describe as well-structured rather than ill-structured problems. Uncertainty is less of a consideration for tame or well-structured problems while it is a defining characteristic of wicked or ill-structured problems [17]. The well-structured problems of the case studies had adequate information to alleviate them, clear goals as to what needed to be addressed about them, and had reasonably well scoped arrays of possible solutions, which could be framed in the same political terms as the problems being addressed [48]. The capacities of the entities involved and the projects’ resources were sufficient to solve the problems [17]. The problems were amenable to resolution through negotiated agreement because they were straight forward. The issues involved were broadly recognized with sufficient clarity to act upon them [21]. The projects were adequately resourced and operated within a facilitating legal framework and lacked a history of conflict between key actors and organizations [17]. Neither project was impeded by lack of commitment by participating entities, dominant actors manipulating interactions or distrust among participants [49]. There was consensus on how to define and address the problems in the two case studies. The instrumental case studies were intended to contribute to a broad appreciation of the phenomena [50] of addressing problems through interlocal cooperation. Of interest was learning about and explaining causal links and pathways [42] developed as a consequence of highly focused, interlocal initiatives. A longitudinal case study approach employing archival documentation was used to advance understanding of collaboration dynamics and process performance [17]. For both the Beal Slough Project and Antelope Valley Project case studies, information from the City of Lincoln and the Lower Platte South LPSNRD Archives was utilized. In addition, for the Antelope Valley Project documents from the University of Nebraska-Lincoln Archive were reviewed. Understanding Beal Slough and Antelope Valley Projects as collaborative, administrative arrangements Both case studies can be understood, using Gray’s [18] early typology of collaborative forms, as emerging out of optimism, employing collective strategies, beginning with a clear, if mundane vision, and recognizing the necessity and value in working together rather than being constituted as a result of conflict. Collaboration occurs when entities engage informally and formally over time through repeatedly negotiating, developing, and executing obligations [105]. Successful collaboration is predicated on each entity being able to further its own goals [106] and achieving better performance or lower costs than if it had acted alone [107]. Beal Slough and Antelope Valley Projects were site-specific undertakings [108]. Each focused on planning and implementing around a specific set of on the ground circumstances [17]. Each project was formed through voluntary, self-initiation by their respective partnering entities, rather than being independently convened or externally directed [17]. Each faced an acute policy (physical problem) challenge, with a clear, bounded geographic focus and authority was concentrated in the coordinating authorities responsible for the decision making [17]. Cross-boundary collaboration takes place among parties from dissimilar authorities, sectors, or bodies [107,109]. Guided by coming together around arrays of values, customs, roles, and ways of interacting, governance is how participants in a specific, public policy domain deliberate, decide, exert authority and influence, delegate command, act and oversee implementation [110]. In a regime, participants’ expectations about a concern coalesce through a governing arrangement instilled with decision-make processes, rules, customs and ethics [111]. Building on the above terms, Emerson, Nabatchi and Balogh [112] (6) define a collaborative governance regime (CGR) as a “particular mode of, or system for, public decision making in which cross-boundary collaboration represents the prevailing pattern of behavior and activity”. Emerson and Nabatchi [17] (210) explain CGRs are “fluid, dynamic systems of processes, relationships, capacities, and functions” composed of procedural and institutional arrangements. To identify and organize the concepts for understanding CGRs, Emerson and Nabatchi [17] developed an integrative framework for collaborative governance applicable across a range of settings necessitating cooperation among heterogeneous entities. Beal Slough and Antelope Valley Projects exhibited four distinguishing features of CGRs. They were oriented to broad public policy or service, involved a range of autonomous entities with differing interests, created institutional and procedural norms and rules and had recurring interactions over an extended time frame [17]. See Table 5. PPT PowerPoint slide PNG larger image TIFF original image Download: Table 5. Distinguishing features of collaborative governance regimes exhibited by Beal Slough and Antelope Valley Projects. https://doi.org/10.1371/journal.pwat.0000090.t005 Learning in the service of administrative coordination Collaborating across entities necessitates creating and using new, pooled information [17]. Leach et al. [113] (592) define learning in the context of public administration “as the process by which people develop a more comprehensive and accurate understanding of the science, technology, law, economics, and politics that underlie the decisions they make or the recommendations they advance.” The need for collaboration grows as a function of increasing complexity and interdependence of institutional infrastructures and as knowledge becomes more specialized and dispersed [17,49]. In addressing a shared problem, the requisite knowledge may come predominantly from a single lead entity with substantial expertise in the shared problem. The LPSNRD led the BSP because of its flood control expertise. Not all parties have to contribute technical knowledge. For example, in the BSP neither the NDCS nor NEMA contributed flood control expertise while the former gave financially and the latter provided oversight for funds originating from FEMA [57]. The deliberation process for the BSP focused primarily on design alternatives, costs, and funding for the shared flood control problem. All parties were familiar with floodplain regulations and flood control works, while recognizing the lead expertise of the LPSNRD [57]. In the BSP the partners selected a preferred solution, allocated costs and arranged responsibilities for project implementation to achieve their shared goal of reducing the flood threat to a specified area. In doing so, they removed the Nebraska State Penitentiary from the 100-year floodplain [57,58]. The interlocal agreement for the BSP [57] outlined the roles and responsibilities of the partners, their financial shares in the project and designated the LPSNRD to administer implementing the project. Unlike for the AVP, no novel administrative structure was created, and no subsequent, substantive decisions were needed. In addressing a set of cross-sector braided problems, it is unlikely the expertise for addressing all the problems will be housed within a single entity. A wide range of pooled knowledge is required, since the problems can be substantively different from each other. Consequently, to address their problem, experts in one field must negotiate accommodating knowledge very different from their own. This happened in the AVP. LPSNRD and University representatives had limited understanding of traffic engineering and yet they needed to understand the City transportation engineers sufficiently to be able to address the problems for which they were responsible. LPSNRD brought flood management expertise to the partnership, which the University did not have and the City had, as noted above, delegated to the LPSNRD in a 1963 agreement. The University team brought institutional campus knowledge, including about campus facilities, such as playing fields, and experiential knowledge of student pedestrian behavior, which the City and LPSNRD did not have. The City’s authority and expertise were in transportation, floodplain regulation, urban land use, including zoning and community revitalization. Clear and complementary domains of expertise, led to partners being willing to leave issues to subject matter experts. Addressing a braided problem set benefits from a rigorous, up-front process in which all entities clarify the problems each need addressed and maps these problems relative to the other problems as a prerequisite to developing joint or coordinated solutions. Ideally, participants prioritize championing the complete package of solutions. While problems may vary greatly in terms of scale, resources to address them, costs of ameliorating them, technical complexity and the vociferousness of their advocates, to achieve success all problems require equal standing in the collaboration. The consensus requirement in the AVP meant community redevelopment had veto power, notwithstanding 50% of the project cost was transportation infrastructure alone [65]. Inevitably, in addressing a set of braided problems there will be unequal understanding of each problem among participants even while outsiders hold all participants accountable for the entire undertaking. Participants in collaboration may confront reduced control over what happens and murky accountability [114]. In both cases, the value of leveraging the relevant, substantive expertise existing in collaborating entities became apparent. It is important to acknowledge the technical contribution among participants inevitably will be uneven, driven as it is by specific, situational requirements. At the same time, each entity has a vital role in ensuring the collaborative process works for all engaged in it. Remapping as policy-oriented learning While a disaster as a major perturbation external to a policy system is a common pathway to policy change [115], the remapping of the Beal Slough and Antelope Valley floodplains exemplify policy-oriented learning as a pathway to policy change. In both cases, the remapping documented a greater area would be exposed to the flood threat than had previously been thought. FEMA developed Flood Insurance Rate Maps (FIRMs) throughout the country as flood prone communities were identified. Each FIRM represents what the risk was when the study on which it was based was conducted. Not incorporated are factors likely to increase flooding in the future, including the consequences of future urbanization, development, and climate change [3]. The BSP was necessitated by the findings of a 2005 FEMA floodplain remapping project under the Digital Flood Insurance Rate Map Program. The entire watershed had become urbanized, and with urbanization, the total volume and the timing of the runoff increased significantly. In the previous mapping of the Beal Slough Floodplain, the State Penitentiary had been only partially in the 100-year floodplain. In the updated floodplain map the entire facility was included, with both expanded extent and flood elevations .6 to 1.2 meters higher, putting the penitentiary in harm’s way. Improvements to Beal Slough to increase its carrying capacity would take the State Penitentiary back out of the floodplain. This was important to do because the State of Nebraska realized it would be challenging to evacuate the penitentiary quickly because of the incarcerated population inside [58,71]. The AVP was necessitated by the findings of a routine, second generation FEMA floodplain remapping project in 1986. The remapped floodplain was greater in extent than the floodplain that had been mapped previously, with increased base 100-year flood elevations, and without a designated floodway. This resulted in a significant, heightened risk to the area [60,84]. The remapping of the Beal Slough and Antelope Valley floodplains resulted in up-to date and accurate assessments of the physical exposure to the flood hazard in each setting. The legal, economic, and political ramifications of the new technical information for each floodplain made the status quo no longer acceptable. The new information from the remapping resulted in altered intentions about pursuing policy objectives and as such constitutes policy-oriented learning [116]. That there was the necessary coordination between the authority generating the flood hazards maps and the authorities able to act on the information acquired cannot be taken for granted [117]. Policy learning here is instrumental, as the information generated from the remapping exercises was used to inform new decisions and actions required to mitigate the flood hazards as now understood [118,119]. The instrumental use of information refers to when a direct connection can be discerned between information and its specific use in problem solving or decision making [119]. Concluding discussion With the appreciation of the value of integrating flood control measures into urban planning [120] comes the need to consider what form of administrative coordination will be required. The Beal Slough Project employed an interlocal agreement, an established procedure in the State of Nebraska, to create and employ a straightforward administrative mechanism to achieve the particular goal of flood mitigation in a specific subwatershed. The AVP required a more innovative approach to administrative coordination than BSP because it necessitated forging a new policy subsystem to address the braided problem set. That problems in a set of braided problems are distinct means the range of considerations is broader than in addressing a shared problem. Coordination in addressing braided problems is paramount. Keeping everyone engaged in the process until all problems are resolved is critical because partial solutions may result in some constituencies getting nothing. Competition among problems, each with its own constituency is a real prospect. As a result, consensus arrangements are important in assuring project completion. Flood protection is a leading priority for urban water sustainability [7]. Consequently, there is potential value in conducting a cross-case investigation with more urban flood management case studies or using a case-oriented approach to probe more cases with wider variation in administrative coordination than were considered in this proof-of-concept exercise. For example, BSP and AVP have the properties of unitary subsystems, with strong cohesiveness and coordination, a great deal of independence from other subsystems and structured, amicable decision-making venues. Conditions would be different in collaborative subsystems and even more different in adversarial subsystems [121]. As floodplain remapping revealed the need for BSP and AVP, future floodplain remapping around the world may reveal changes, including anthropogenic climate change, requiring new adaptation and mitigation. Ideally, remapping will benefit from increasing accuracy, stemming partly from adding years to the rainfall record into calculating flooding probabilities, from advances in probabilistic flood forecasting [122] and analytical strategies, such as projections and probabilities for planning water infrastructure [123]. When policy actors are not animated by solving the same problem, the deliberation process benefits from including structured exchanges to facilitate solving each of the separate problems for which partners may have non-overlapping constituencies and interests. This makes how problems get prioritized and how to frame issues important. Rather than pitting one issue against another, the intent is for those affected to see merging points and interdependences. How the exchange of information get structured becomes key in enabling policy actors to recognize and appreciate the links between their entities’ problems and those of other entities. A key implication of this work is the value of a simple delineation between a largely, standalone public policy problem and one that is part of a braided problem set. Recognizing at the outset whether a flood mitigation problem can be addressed independently or not is to acknowledge from the beginning how administratively complex its resolution likely is to be. Distinguishing between a standalone problem and a braided problem set is to recognize whether the parties involved are focused on a shared problem or are giving time to a problem that is not their primary concern as a means to solve another problem that is. This recognition points to when reducing flood risk in cities can and cannot be treated as a largely autonomous matter. Regardless of where it is generated, new knowledge about evolving flood threats generated through routine mapping can be a sufficient spur to undertake extensive and long-term flood mitigation. While there continue to be valuable and innovative non-structural approaches to flood mitigation there are circumstances, such as in urban corridors where space is limited, for effective and appropriate use of structural solutions. Establishing the administrative coordination necessary to undertake such solutions takes considerable time and resources. It works best when there is a good fit between the capacities of entities and the responsibilities assigned to them. Creating administrative coordination mechanisms intended to exist in perpetuity is not always advisable. Therefore, it is constructive to recognize why and when it makes sense to create a mission executing entity that only exists for the duration required to fulfill its mandate. Completing the BSP and AVP highlight the necessity of negotiating the requisite aspects of the specific contexts in which flood mitigation projects are made necessary. Even in best case scenarios, problems are not solved indefinitely, situations change, and problems get redefined or morph [23,34,124]. Flood risk changes all the time for many reasons, including changes in land use and patterns of rainfall [3]. Concurrently, collaborative processes evolve [107]. So much of flood risk management in the context of sustainable, resilient cities requires jurisdictions to cooperate. Consequently, it is worthwhile to refine our understanding of how this occurs with the intent of achieving the most appropriate, effective practices and intended outcomes. Acknowledgments Glenn Johnson, former General Manager, Lower Platte South Natural Resource District, Lincoln, Nebraska, U.S.A. provided valuable insights and was instrumental in documenting and assessing the workings of the Beal Slough Project and the Antelope Valley Project. Key documentation was obtained from the archives of the City of Lincoln, the University of Nebraska-Lincoln, and the Lower Platte South Natural Resources District. The author acknowledges the efforts of the participants in the Beal Slough Project and Antelope Valley Project for their contributions to the projects that were the basis of the paper’s two case studies. Two anonymous reviewers provided valuable feedback on an earlier version of this paper. Support for publication was provided by the Robert B. Daugherty Water for Food Global Institute at the University of Nebraska. [END] --- [1] Url: https://journals.plos.org/water/article?id=10.1371/journal.pwat.0000090 Published and (C) by PLOS One Content appears here under this condition or license: Creative Commons - Attribution BY 4.0. via Magical.Fish Gopher News Feeds: gopher://magical.fish/1/feeds/news/plosone/